Laserfiche WebLink
<br /> ----~.- <br />. <br /> Contract Unit Quantity Amount <br />No. Item Unit Quantity Price toDate to Date <br />57 Seeding, incl seed, fertilizer, and wood fiber <br /> blanket SY 130 3.00 $0.00 <br />58 Silt fence, regular LF 60 2.00 $0.00 <br />59 Protection of catch basin in street EA 14 45.00 14 $630.00 <br />60 Ditch excavation LF 400 17.76 $0.00 <br /> Total Part 4 - Storm Sewer $49.740.30 <br /> Part 5 - Street <br />61 Sawing bituminous pavement LF 130 4.00 52 $208.00 <br />62 Remove concrete curb and gutter LF 12 5.00 $0.00 <br />63 Remove bituminous pavement SY 725 2.00 821.5 $1.643.00 <br />64 Mill bituminous pavement l' wide LF 60 5.00 $0.00 <br />65 Subgrade preparation SY 8150 0.78 8150 $6.357.00 <br />66 Subgrade excavation (EV) CY 225 8.00 289.1 $2,312.80 <br />67 Geotextile fabric, Type V SY 8150 1.40 8150 $11.410.00 <br />68 Select granular borrow (CV) CY 10300 10.25 9500 $97.375.00 <br />69 Aggregate base, Class 5 TN 3100 10.32 2800 $28,896.00 <br />70 Type LV non-wearing course mixture - LVNW <br /> 35030B TN 650 33.50 756 $25,326.00 <br />71 Type MV wearing course mixture - MVWE <br /> 35030B (2003) TN 650 37.00 $0.00 <br />72 Bituminous material for tack coat GAL 340 1.50 40 $60.00 <br />73 Adjust frame and ring casting EA 5 450.00 $0.00 <br />74 Adiust valve box EA 4 200.00 $0.00 <br />75 Surmountable concrete curb and gutter LF 3580 7.52 3466 $26.064.32 <br />76 Water for dust control 1000 GAL 100 0.01 $0.00 <br />77 4" Perforated polyethylene pipe LF 3580 4.50 3466 $15,597.00 <br />78 Salvage barricade EA 3 25.00 $0.00 <br />79 Type III barricade EA 2 350.00 $0.00 <br />80 Skids!eer (bobcat) with operator HR 15 75.00 $0.00 <br />81 Street Sweeper with pick up broom with operator HR 15 90.00 $0.00 <br />82 Seeding AC 1.6 2200.00 $0.00 <br />83 Topsoil borrow CY 40 0.01 $0.00 <br />84 Sodding. lawn type SY 300 3.50 $0.00 <br />85 Clear and grub LS 1 1200.00 $1.200.00 <br />86 Cammon excavation - trail or sidewalk LF 1380 2.80 $0.00 <br />87 Aggregate base, Class 5 - trail TN 700 10.82 $0.00 <br />88 Bituminous wear course, L\/'INE45030B, Pathway TN 200 44.00 $0.00 <br /> T olal Part 5 - Slreel $216.449.12 <br /> <br />Total Part 1 - Sanitary Sewer <br />Total Part 2 - Watermain <br />Total Part 3 - Services <br />Total Part 4 - Storm Sewer <br />Total Part 5 - Street <br />Total Work Completed To Date <br /> <br />$46.307.30 <br />$34,837.20 <br />$40.813.10 <br />$49.740.30 <br />$216,449.12 <br />$388,147.02 <br /> <br />61602126REQ3 <br />