Laserfiche WebLink
<br />Oce 02 2002 11:35AM BOHESTROO ROSENE AHDERLIK 6516361311 <br /> <br />CSAH '4 Water Main <br />City of Centerville <br />October 2, 2002 <br />Fila No: 616-01.123 <br /> <br />Construction Costs <br />To'tal Base Bid <br />Change Orders, Add'l work, oontingenoies <br />TOTAL CONSTRUCTION COSTS <br /> <br />Indirect Cos1s <br />Engineering - report, design, contred <br />management <br />Slaking, inspec~on, recqrd <br />plans. construction engineering, ..Ie. <br />Soil wrings <br />Assessment Flell <br />TOTAL INDIRECT COSTS (2Q%l <br /> <br />TOTAL PROJECT COSTS <br /> <br />$158,803 <br />5,907 <br />$164,710 <br /> <br />$18.775 <br /> <br />9,000 <br />4,000 <br />1,134 <br />$32;909 <br /> <br />$197,6'9 <br /> <br />.' <br /> <br />p.2 <br /> <br />. <br /> <br />< <br />