My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-12-19 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2002
>
2002-12-19 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2009 11:26:33 AM
Creation date
5/13/2009 11:25:10 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br /> <br />Unapproved Minutes <br />Centennial Lakes Police Commission Meeting <br />November 14,2002 <br />At Centerville City Hall <br /> <br />Minutes prepared by Tim Swedberg <br /> <br />1. The Meeting was called to order by Chair Karen Varian at 7:00 PM. <br /> <br />2. Roll Call: (Members present were) <br />Chair Varian <br />Commissioner Pitchford <br />Commissioner Korst <br />Commissioner Lund <br />Commissioner Simons <br />Commissioner Wright <br />Commissioner Mahr <br />Commissioner Grahek <br />Commissioner Swedberg <br /> <br />Ex Officio: <br />Chief Heckman <br /> <br />3. Public Forum <br />Presentation before the Commission <br />Many members of the sworn and support staff of the Department were in attendance. <br />The Police Commission received a signed memo from the employees of the Centennial <br />Lakes Police Department (CLPD) on November 14, 2002. Ms. Gerry Rismoen gave a <br />presentation to the Commission on behalf of department employees. Ms. Rismoen <br />outlined both immediate health and safety concerns and the need for long-term <br />solutions to facility problems. <br /> <br />In the letter employees' state, "We have respectfully requested that a new police <br />facility be constructed." They also request, "that an outside consultant <br />immediately be retained to evaluate the liabilities of our current facilities and to <br />assess the costs necessary to add to our present location those areas that are <br />essential to our safety and well being." <br /> <br />Following are the notes taken of Ms. Rismoen's comments before the Commission. <br />They were not presented as priorities, but a list of concerns. <br /> <br />1. The facility was originally built for 8 people <br />2. They have common bathroom facilities and prisoners use those facilities as well <br />3. They no longer have space for lockers - just a hook on the wall <br /> <br />LL <br />
The URL can be used to link to this page
Your browser does not support the video tag.