Laserfiche WebLink
<br />Lino Lakes and Centerville request and the State <br /> <br />agrees to the installation of Emergency Vehicle Pre-emption <br /> <br />Systems, (EVP Systems), as a part of the new Traffic Control <br /> <br />Signal installations. The existing Traffic Control Signals have <br /> <br />EVP Systems currently fully operational. <br /> <br />The County, Lino Lakes, Centerville and the State will <br /> <br />participate in the maintenance, operation, and electrical energy of <br /> <br />the new and existing Traffic Control Signals, EVP Systems and <br /> <br />Interconnect. <br /> <br />CONTRACT <br /> <br />1. The County, with its own resources or by <br /> <br />contract, will install new Traffic Control Signals and EVP <br />Systems on County State Aid Highway No. 14 at 21st Avenue (System <br /> <br />"A"); and on Trunk Highway No. 35E at County State Aid Highway <br /> <br />No. 14, West Ramps (System "B") and East Ramps (System "C"); and <br /> <br />provide maintenance and electrical energy for the existing <br /> <br />Traffic Control Signals on County State Aid Highway No. 14 at <br /> <br />County Road No. 84 (Otter Lake Road) and at County State Aid <br />Highway No. 54 (20th Avenue); and install Interconnect on County <br /> <br />State Aid Highway No. 14 from County Road No. 84 (Otter Lake <br />Road) to County State Aid Highway No. 54 (20th Avenue) pursuant <br /> <br />to State Project No. 0282-25 (T.H. 35E=390) and State Aid <br /> <br />Project No's 02-614-28 and 02-614-29. The Construction Costs and <br /> <br />94607M <br />-2- <br /> <br />l<l <br />