Laserfiche WebLink
<br />State-furnished Materials Cost will be covered in Municipal <br /> <br />Agreement No. 94579. <br /> <br />2. Lino Lakes will be responsible for the cost and <br /> <br />application to secure an adequate power supply to the service <br /> <br />pads or poles for Systems "Au, "Bu, "CU and the existing Traffic <br /> <br />Control Signal on County State Aid Highway No. 14 at County Road <br /> <br />No. 84 (Otter lake Road). Lino Lakes will thereafter pay all <br /> <br />monthly electrical service expenses necessary to operate Systems <br /> <br />"AU, "Bu, "CU and the existing Traffic Control Signal on County <br /> <br />State Aid Highway No. 14 at County Road No. 84 (Otter lake <br /> <br />Road) . <br /> <br />3. Upon completion of this project (System "AU), It <br /> <br />shall be the County's responsibility, at its cost and expense, <br /> <br />to: (1) replace the signal system L.E.D. indications; and <br /> <br />(2) clean the new traffic control signal; and (3) clean the new <br /> <br />controller and service cabinets; b) It shall be Lino Lakes <br /> <br />responsibility, at its cost and expense, to: <br /> <br />(1) clean the <br /> <br />luminaire mast arm extensions; (2) <br /> <br />maintain the luminaires and <br /> <br />all its components, including replacement of the luminaire if <br /> <br />necessary; and (3) relamp the street lights; and (c) It shall be <br /> <br />the State's responsibility to maintain the traffic control <br /> <br />signal cabinet, control equipment and interconnect, repair <br /> <br />knockdowns of the new traffic control signal system, perform all <br /> <br />other traffic control signal and street light maintenance, and <br /> <br />94607M <br />-3- <br /> <br />19 <br />