My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-08 CC & WS Agenda
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2009
>
2009-07-08 CC & WS Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2009 6:20:09 PM
Creation date
7/2/2009 2:30:13 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />be responsible for timing and operation of the new Traffic <br /> <br />Control Signal, all on a reimbursable basis with the County. <br /> <br />4. Upon completion of this project (System "B" and <br /> <br />"C"), a) It shall be the County's responsibility, at its cost <br /> <br />and expense, to: <br /> <br />(1) replace the signal system L.E.D. <br /> <br />indications; (2) clean the new traffic control signal; and (3) <br /> <br />clean the new controller and service cabinets; b) It shall be <br /> <br />Lino Lakes responsibility, at its cost and expense, to: <br /> <br />(1) clean the luminaire mast arm extensions; (2) <br /> <br />maintain the <br /> <br />luminaires and all its components, including replacement of the <br /> <br />luminaire if necessary; and (3) relamp the street lights; and <br /> <br />(c) It shall be the State's responsibility at its cost and <br /> <br />expense, to maintain the signing and interconnect and perform <br /> <br />all other traffic control signal and street light maintenance. <br /> <br />5. Upon completion of this project (for the existing <br /> <br />Traffic Control Signal on County State Aid Highway No. 14. at <br /> <br />County Road No. 84 (Otter Lake Road), a) It shall be the <br /> <br />County's responsibility, at its cost and expense, to: <br /> <br />(1) replace the signal system L.E.D. indications; (2) clean the <br />existing traffic control signal; and (3) clean the existing <br /> <br />controller and service cabinets; b) It shall be Lino Lakes <br /> <br />responsibility, at its cost and expense, to: <br /> <br />(1) clean the <br /> <br />luminaire mast arm extensions; (2) maintain the luminaires and <br /> <br />all its components, including replacement of the luminaire if <br /> <br />necessary; and (3) relamp the street lights; and (c) It shall be <br /> <br />94607M <br />-4- <br /> <br />;).D <br />
The URL can be used to link to this page
Your browser does not support the video tag.