Laserfiche WebLink
<br />Aviation <br /> <br />18. Does the plan amendment affect any airport functions? <br />X <br /> <br /> <br />SECTION 5: WATER RESOURCES <br /> <br />Wastewater <br /> <br />19. What type of wastewater treatment will be utilized to serve the proposed amendment? <br /> <br /> <br />LocallMunici al Owned Wastewater Treatment Plant. <br />X Re ional Wastewater Treatment. <br /> <br />2000 <br /> <br />2010 <br /> <br />2020 <br /> <br />2030 <br />Mgd = million gallons per day <br /> <br />20. Complete the following table, to show whether this plan amendment increases or decreases wastewater <br />flow from currently planned land use and sewer flow projections. <br />Total Community Flow <br />Pre-Amendment (mgd) <br /> <br />0.82 <br /> <br />2.08 <br /> <br />2.49 <br /> <br />NA <br /> <br />Total Community Flow <br />Post Amendment-(mgd) <br />NA <br />2.21 <br />2.87 <br />NA <br /> <br />21. Does the local wastewater system have adequate capacity, or staged capacity to accommodate the <br />proposed amendment? <br /> <br />X Yes, explain: <br /> <br />The existing gravity sewer, which currently ends at Main St., will be extended north to <br />serve the new development. The existing lift station (no. 8) on 21st Ave., south of Main <br />St., has sufficient capacity to serve the development through approximately 2010. It can <br />be u raded to serve the ultimate develo ment b re lacin um s. <br /> <br />No, ex lain: <br /> <br />September 2005 <br /> <br />8 <br />