Laserfiche WebLink
<br />1- <br /> <br />C) Trench <br /> <br />Administration <br /> <br />0.25 x <br /> <br />Verification <br />1) Plan Review <br /> <br />1.50 x <br /> <br />2) Inspecti on <br />a) Location before work <br />b) Compliance during work <br />c) Completion after work <br />d) Re-inspection <br /> <br />40 <br /> <br />= <br /> <br />45 <br /> <br />= <br /> <br />0.50 x 30 = <br />1.50 x 30 = <br />1.50 x 30 = <br />0.75 x 40 = <br /> <br />3) Testing Result Review <br />a) Compaction <br />b) Material <br /> <br />0.083 x <br />0.083 x <br /> <br />4) Mapping <br />a) Review data <br />b) Transfer to city mapping <br />(AutoCAD) <br /> <br />0.50 x <br />0.25 x <br /> <br />Total Cost <br /> <br />40 <br />40 <br /> <br />= <br /> <br />= <br /> <br />45 <br />45 <br /> <br />= <br /> <br />The average trench is 330 lin. ft past the width of a hole. Therefore, <br />the number of 100 lin. ft. (or portion thereof) units is 4. The cost per <br />100 lin. f1. unit is 275.40/4 = $68.85/100' unit. <br /> <br />Proposed Fees <br /> <br />2. Obstruction Permit Fee <br /> <br />A) Administration <br />B) Recording <br />C) Review <br /> <br />0.25 x <br />0.25 x <br />0.75 x <br /> <br />$10.00 <br /> <br />67.50 <br /> <br />15.00 <br />45.00 <br />45.00 <br />30.00 <br /> <br />3.33 <br />3.33 <br /> <br />22.25 <br />11.25 <br /> <br />$275.40 <br /> <br />= $70.00/100 lin. ft. <br /> <br />(Plus Hole Fee) <br /> <br />40 <br />40 <br />45 <br /> <br />= <br /> <br />= <br /> <br />$10.00 <br />$10.00 <br />$33.75 <br /> <br />14 <br />