Laserfiche WebLink
<br />Minimum Base Coat <br />Proposed Base Fee <br /> <br />$53.75 <br />$50.00 <br /> <br />Plus additional fee based on length <br /> <br />Inspection <br /> <br />I) Compliance during work <br />2) Completion after <br /> <br />1.50 x <br />0.25 x <br /> <br />30 <br />30 <br /> <br />= <br /> <br />$45.00 <br />$ 7.50 <br /> <br />= <br /> <br />Additional fee on assumed 1000 lin. ft permit <br />Additional cost per lineal foot - $52.50/1000 <br /> <br />= <br /> <br />= $52.50 <br />0.0525 <br /> <br />Proposed fee = $50.00 plus 0.05 lin. ft. <br /> <br />3. Permit Extension Fee <br /> A) Administration 0.25 x 40 $10.00 <br /> B) Recording 0.083 x 40 = $3.33 <br /> C) Review 1.0 x 40 $40.00 <br />Total Cost = $53.33 <br />Proposed Fee $55.00 <br />4. Delay Penaltv <br /> A) Administration 1.50 x 40 = $60.00 <br /> For up to 3 days of non-completion and non-prior notice before specified completion <br /> date. <br /> <br />After 3 days, an additional charge of $1 O.OO/day will be levied. <br /> <br />Total Penalty Charge <br />(Up to 3 days late) <br /> <br />= <br /> <br />$60.00 <br /> <br />Each day late over 3 days <br /> <br />= $60.00 <br />Plus to.OO/day <br /> <br />5. Def:radation Fee Formula <br /> <br />15 <br />