My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-04-27 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2005
>
2005-04-27 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2009 10:55:26 AM
Creation date
7/21/2009 10:53:55 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />extension of coocrele mP.iIi..... It is UIIderstood that the Coon!y reserves the right to exrend the concrete <br />mP.iIi'U1S as shown on Exhibit "A" thereby reducing full access points 10 right iDlright out accesses. The costs <br />of these improvements will be determined a11be time of COOlItIUction and are expected 10 be &bared by the <br />County, City and Developer. <br /> <br />RlGRT OF WAY: <br /> <br />A traffic signal is anticipated at the <br />the signal will be iustaIIed with <br />constructedalCSAHI <br /> <br /> <br />BITUMINOUS TRAIL AND CONCRETE SIDEWALK: <br /> <br />The parties agree !bat the consln1ction of the bituminous lraiI <br />funds and that all matching funds will be contributed by the <br />trail and walk includes: bituminous and concrete smfacing, aggre <br />comctiOll, excavalioo, borrow mall:rial (granular and topIloiI), and turf <br />the County will pay for the design of the UBiI and walk, wetland mitigatio <br />IIail and walk, the additional right of way and 10 c <br />location. and any removal items, wilh the exc <br /> <br />are eligible for- federal <br />understand thai the cost for the <br />. s if required, soil <br />The parties agree that <br />by impw:ts caused by the <br />the trail and walk at the proper <br />COllSlruct the trail and walk. <br /> <br />TRAFFIC SlGNAUl: <br /> <br />Avenue N) intersection. The parties agree thai <br />are met. The parties agree that conduit will be <br />for a futIU"e signal. <br /> <br />TRAFFIC CONTRO <br /> <br />]4 will be closed wilh traffic detomed for a period of time 10 <br />new bridge over Rice Creek. The closwe will be limited to the <br />soil correction and conslruCt two paved lanes in the area requiring <br />bridge. <br /> <br />D <br /> <br />all driveways affected by the Project will be reconstructed in kind with the cost of BDY <br />by the City including concrete aprons to be the responsibility of the City. <br /> <br />LANDSCAPlNGlSTREETSCAPING: <br /> <br />The parties agree that if the City wishes to include landscapinglstn:etscape featwes in the Project. they shall <br />be designed in accoolance with Anoka County Highway Department ~Streetscape Guidelines. The <br />cost of the design and coostroction of these featwes will be the n:spoosibility of the City. The City sbaIl <br />provide all construction documents including plans, specifications, and estimated quantities and cost to the <br />County for inclusion in the project bid documents. All construction documents DBl51 he submitted to the <br />County by July 1,2005. <br /> <br />Page 2 of4 <br />ll~ikOZ-.61""24MOU.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.