My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-05-11 CC Set Agenda
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2005
>
2005-05-11 CC Set Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2009 2:20:46 PM
Creation date
7/21/2009 2:20:31 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, . <br /> <br />BITUMINOUS TRAIL AND CONCRETE SIDEWALK: <br /> <br />The parties agree that the construction of the bituminous trail and concrete sidewalk are <br />eligible for federal funds and that all matching funds will be contributed by the City. The <br />parties understand that the cost for the trail and walk includes bituminous and concrete <br />surfacing, aggregate base, sub-drains if required, soil correction, excavation, borrow <br />material (granular and topsoil), and turf establishment. The parties agree that the County <br />will pay for the design of the trail and walk, wetland mitigation required by impacts caused <br />by the trail and walk, the additional right of way and easements required to construct the <br />trail and walk at the proper location and any removal items with the exception of soils <br />required to construct the trail and walk~9\\"cver. should_the parties 1101\)(:.' sLlccessful in <br />obtaining federal funds for trails and sidewalk. Count\' shall also pay for excavation, <br />bOITO\v T}}atcriai and soil correction~. <br /> <br />TRAFFIC SIGNALS: <br /> <br />A traffic signal is anticipated at the CSAH 14/CSAH 21 (20th Avenue N) intersection. The <br />parties agree that the signal will be installed with this project if the warrants are met. If <br />warrants are not met, the four-way stop shall be continued at that location. The parties <br />agree that canduili-will be constructed at CSAH 14/Centerville Road intersection, at <br />Dupre Road, (illd Brian Drive-O- for future signals. The four-wa\ stoP at CSAH <br />J4Cemerville Road nil! be continued until a signal canJn.' installed. The mediall ofCSAH <br />14 at 21st Street will remain open for full turning m()\'l'ments until construction ofa nl'\\- <br />intercham~:e b\ M"JD0T. at which timl' a siQ:nali_zed intersectio_ll shall be installe~ <br /> <br />TRAFFIC CONTROL: <br /> <br />The parties understand and agree that CSAH 14 will be closed with traffic detoured for a <br />period of time to perform soil correction and construction of the new bridge over Rice <br />Creek. The closure will be limited to the period of time required to complete the soil <br />correction and construct two paved lanes in the area requiring soil correction and construct <br />the bridge. <br /> <br />UTILITIES: <br /> <br />The parties agree that the Exhibit "A" Layout does include specific proposed utility <br />locations. The City will be responsible for the design of any sanitary sewer and watermain <br />improvements, which will be incorporated in the project bid documents_ The cost of the <br />design and construction of these features will be the responsibility of the City. The City's <br />design of the sanitary sewer and watermain utilities are to include plans, specifications, and <br />estimated quantities and cost. All construction documents must be submitted to the <br />County by Sentel110cr 1.2005. <br /> <br />Deleted: conduit <br />i Deleted: a future sir;nal <br />, c <br /> <br />, Formatted: Super~riPt <br /> <br />Deleted: Jul\' 1 <br />'-- -=--.- <br />
The URL can be used to link to this page
Your browser does not support the video tag.