My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-04-05 P & Z Agenda
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2005
>
2005-04-05 P & Z Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2009 8:38:15 AM
Creation date
7/22/2009 8:37:16 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Effective: 5/26/82 <br />City ofCenterville Ord. #14 <br /> <br />SECTION 8. PUBLIC HEARING: <br /> <br />After bids have been received, but before any contract is let or any work is ordered by day labor <br />for any improvement, the City shall hold a public hearing on the proposed improvement <br />following two (2) publications in the newspaper ofanotice starting the time and place of the <br />hearing, the general nature of the improvement, the estimated cost, the area proposed to be <br />assessed, and that the City Council proposes to proceed under the authority granted by Chapter <br />398 Laws ofl953. <br /> <br />SECTION 9. PARTIAL STREET CONSTRUCTION: <br /> <br />It shall not be the intent ofthis ordinance to force the construction ofall of these streets in any <br />subdivision. The owner or developer shall be permitted to petition for the construction of certain <br />streets in the subdivision without having to include all ofthe streets at anyone time. In <br />constructing part of the streets, it will be necessary for the owner or developer to include streets <br />which will make a complete circuit, that is, they shall leave a finished street and return to a <br />finished street so that there will be no dead ends when the construction has been completed. <br />Building permits shall be issued only for those lots having access to a street which has been <br />constructed or for which agreements are on file with out having to include all of the streets at any <br />one time. <br /> <br />SECTION 10. STREETS HAVING LESS THAN STANDARD WIDTH: <br /> <br />In cases where any temporary or permanent street has a width less than 60 feet, the design and <br />specifications for construction shall be considered as special. The City Administrator shall <br />design such street in such a way as he deems best of the contemplated use. The petitioner shall <br />be required to enter into special agreements pertaining to the construction of these streets. <br /> <br />SECTION 11. PARTIAL MAINTENANCE: <br /> <br />After a street has been completed to a point where it can be used and after building permits have <br />been issued for construction of buildings on property fronting on said streets, the street shall be <br />placed on the routine maintenance list of the City. Snow plowing operations will be carried on in <br />the winter time and general balding operations in the summer time on these streets at the expense <br />of the City. This shall not in any way constitute final acceptance by the City and such <br />maintenance or partial acceptance of the Council shall not have any effect upon agreements existing between the City and the owner for further improvements on such streets. <br /> <br />SECTION 12. SANITARY SEWERS: <br /> <br />Wherever sanitary sewers are available, the owner of any new subdivision shall be required to <br />connect each and every house to such sewer system. All of this work shall be done prior to th <br />stabilization of any street base. This shall also apply in cases where detailed plans and <br />specifications for sanitary sewers to serve the district in which the subdivision is located are <br />available. <br /> <br />Page 4 of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.