My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-05 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2009
>
2009-08-05 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2013 11:34:41 AM
Creation date
7/31/2009 7:35:40 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3. Devartment Staffine: I am working with my management to provide the <br />necessary staffing of officers, CSO's and reserve officers. I need to handle <br />incident command for the run (see also "radio communications" below). <br />There will be no closure permit issued for the Main Street and Centerville <br />Road intersection 1 and therefore the intersection will have to be <br />personally controlled to permit vehicles to turn southbound on <br />Centerville Road from time to time.2 In a perfect world there will be five <br />(5) marked vehicles available to handle control points that day. <br /> <br />4. Anoka County Park Closure: Pat is to provide us with docUllJentation that we <br />are permitted to close the park. My understanding is 30 minutes was <br />approved. I do not know whether the approval was verbal or written. Written <br />approval is needed. <br /> <br />5. Fire/EMS: Tom advises that CFD will be providing one rig for the event. <br />EMS will also be on scene (Russ to double check). <br /> <br />6. Radio Communications: Tom reports having 20 radios. They are !!!!! <br />compatible with our police radios. The incident commanders will need to tie <br />themselves to each other to have full radio capabilities. (TomlPat to <br />determine incident commander for event) <br /> <br />7. 8K Run Permit Issues: I have looked at the permit and yesterday made minor <br />corrective revisions to it with Tom. There are 9 items under the "Police <br />Department" category and my responses thoughts thereon as follows: <br /> <br />-Emergencv vehicle access: Pat to obtain keys for the gates on either end <br />of the trail portion of the run <br />- Traffic/safety street closures: covered above <br />-Appropriate barricades: being provided as needed by TomlPat <br />-Police personnel reauired/available: yes, but nUllJber not yet confirmed <br />(CLPD) <br />-Portable toilet facilities: per Tom, 4-5 in the area of the start line and <br />additional ones at the finish <br />-First aid facilities: on a mobile basis by CFD and EMS <br />-Internal security and crowd control: by Pat <br />-Nighttime lighting: N/A <br />-Other provisions as may be reQuired: a) written proof of permission to <br />close the county park during the event and the duration allowed, b) three <br />(3) volunteers with radios on bicycles along trail path portion of event, c) 2 <br />water stops not including start and finish line (Waterworks lot and beach <br />house), d) parking availability in St. Genevieve's community center lot <br /> <br />I The road closure permit for the parade does not cover the 8K run. <br />2 This intersection is approximately 1.2 miles into the course. The leaders will hit it at about 10-11 minutes. <br />The walkers won't arrive until approximately 24 minutes. <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.