<br /> <br />tervilfe <br /> <br />'uta[{isliea l8..<;i <br /> <br />CITY OF CENTERVILLE <br />MONTHL Y ENGINEER'S REPORT <br />For August 12, 2009 City Coundl Meeting <br /> <br />Italics = New information. <br />Normal = No change from last report. <br /> <br />1. 210t Avenue/Badlage Road (000616-05143-0). WOIk has begun on cta!/ting a timl plat for the <br />property. A mme for the road will need to be chosen soon. <br /> <br />2. Old Mill Road Improvements (000616-06147-0). We received the signed timl {J8Y request from <br />the bonding com{J8ny. However, they have not provided all IC-l34s or Lien WaJi.eo:s and have statBd <br />that he will not be able to produce them. T11e aty Attomey is reviewing the situation. <br /> <br />3. Clearwater Creek Estates (Hanzal Property) (000616-06154-0). Reseeding of the corrected <br />mitigation area has been completed. A skimmer structure is to be plared at the pond outlet per RCWD <br />requirements. Once the seeding is established and the skimmer structure is Installed, we can finalize <br />the project and ask RCWD to release their permit surety. <br /> <br />4. Hidden SprIng Park (000616-07155-0). All outstanding issues at the {J8/k have now been <br />iJddressed. The aty's Parlrs and Rec. Committee recommended approval of timl {J8yment to <br />8onestroo. <br /> <br />5. COmprehensive Plan (00061&-o7157-0). T11e aty's Planning and Zoning Commission held a til7i1! <br />public hei1rtng on the adoption of the plan at their last regular meeting (8/4). T11ere were no comments <br />from the public. T11e aty Council should now consider a resolution i1doptfng the timl plan. <br /> <br />Moving fotward, next steps include revisions to ordinances as required by the plan as well as other <br />implementation items. <br /> <br />6. CSAH 14 ConstnK:tion ServialS (00061&-07159-0). The City's public works staff has been <br />handling the remaining project insped:ion work with the exception of issues related to the electrical <br />system for the lighting. On a limited basis, we have been assisting City personnel as needed at our <br />normal hourly rates. <br /> <br />7. Downtown Redevelopment COmprehensive Infrasbuc:ture Plan (00061&-o7161-o). aty <br />staff will be investigating our options with regard to grant monies for Block 8 after receiving <br />rorrespondence from the funding agency asking that a draw on the monies come before the end of the <br />year. <br /> <br />8. TE Grant Trail Project (000616-08165-0). aty staff has requested the tinal appraisals for some <br />iJdditional easements which will be needed. Once these are complete, the next steps In property <br />iKX/uisltfon will need to take place. <br /> <br />We are working to finalize the plans and submit them to MNDOT for formal review. We have also <br />received formal comments from MNDOT on our Project Memorandum. We are making those revisions <br />to that document and will send It on to the county when finished for their approval. <br /> <br />MNDOT has given us their comments on our preliminary design. They have given us the go-ahead to <br />move segment L to the location along Brian Drive. We also received comments from Anoka County. At <br />our most recent meeting with the Parks Committee, it was dedded to take the Pergola! Arbor off the <br />project to keep costs down and to go with a more modest kiosk. We will be finalizing the plans and will <br />be ready to move towards acquiring the necessary easements. This process will likely take us into late <br />fall, making a Spring 2010 construction the most likely scenario. <br />