Laserfiche WebLink
<br />9. 2008 Downtown stonn Water Improvements (000616-08167-0). Bonestroo water resources <br />staff have CXJfT7p1eted some prefiminary engineering to ensure this amcept is a viable option. We Will be <br />meeting with Rice Creek Watel5hed DistJict staff and Anoka County Parks staff to discuss our findings <br />and present our prefiminary plan. once we have their buy-in, we will bring forward a proposal to <br />CXJfT7p/ete the plans and specs. <br /> <br />10. 2009 Pond Dredging (000616-09168-0). The project will remain on hold until next winter. <br /> <br />11. Peltier Lake brive Area Street . Utility Improvements (2009.01) (000616-09169-0), 2009 <br />Street Improvements (2009.02) (000616-09170-0). Water main has now been installed !'rom <br />Mill Road to just !+eSt of the DNR wetland on Peltier Lake Drive. Service lines for this area have also <br />been installed, including those which are being run directly into the home. This area has also been <br />"subaJt", meaning that the road base has been excavated and badd'J11ed with sand and gravel. <br /> <br />CUrb replacement worl: and street subcutting on 75" is CXJfT7p1ete. Other curb replacements in the area <br />crmtinue with milling and bituminous patching scheduled soon. Rain Garden crmstructfon is underway <br />on 75" and backyanJ drainage worl: in the Quebec area is nearing comp/etIon. <br /> <br />- End of memo - <br />