<br />Oly of Cor>fNI/lle <br />2IXJ9 Street 1~15 <br /> <br />PiJge2 <br />8/19/09 <br /> <br />Claim #5 (No work order Issued) <br />This is to clarify that the contract quantity for bid Item No. 57 - Concrete Curb and Gutter (Type <br />III & IV Areas) will be exceeded by more than 25%. No increase or decrease in the unit price <br />will be provided for this work. A change order will be processed to add an additional 2000 LF to <br />this bid quantity. <br /> <br />Claim #6 (No work order Issued) <br />This Is to clarify that the contract quantity for bid item No. 72 - Remove Concrete Curb and <br />Gutter (Type V Areas) will be exceeded by more than 25%. No increase or decrease in the unit <br />price will be provided for this worik. A change order will be processed to add an additional 1000 <br />LF to this bid quantity. <br /> <br />Claim #7 (No work order i-Iledl <br />This Is to clarify that the contract quantity for bid item No. 102 -Concrete Curb and Gutter (Type <br />V Areas) will be exceeded by more than 25%. No increase or decrease in the unit price will be <br />provided for this work. A change order will be processed to add an additional 1000 LF to this bid <br />quantity. <br /> <br />Claim #8 (City-initiated Claim) <br />Per Addendum # 1, contracting requirements of the American Recovery and Reinvestment Act <br />(ARRA) were added to the job in order to keep the City eligible for certain funding. The City has <br />recently learned that this project was not selected to be funded through this program. <br />Therefore, they requested a deduction for savings realjzed if these requirements were lifted <br />effective immediately. Your office provided pricing for this deduction. We concur with this <br />pricing and approve the claim. <br /> <br />Claim #9 (City-Initiated ClaIm) <br />You have asked to substitute hydroseeding/hydromulching for the specified wood fiber blanket in <br />the rain gardens. The City has allowed this substitution with a unit price reduction. Your office <br />provided pricing for this reduction. We concur with this pricing and approve the claim. <br /> <br />Claim #10 fCity-lnitlated Claim) <br />You have asked to substitute hydroseeding/hydromulching for the specified sod behind the short <br />segment curb replacements. The City has ailowed this substitution with a unit price reduction. <br />Your office provided pricing for this reduction. We concur with this pricing and approve the <br />claim. <br /> <br />Claim #11 (Work Order #34091 <br />This claim is for extra worik done to clean the ditch from the newly installed flared end section <br />(FES 100) to the existing pond in the area north of 72'" Street. This work was done at the <br />direction of Bonestroo and City staff. This work was beyond the original scope of the project. <br />The claim is approved. <br />