Laserfiche WebLink
<br />City of C"-'71e <br />2(1)9- I_ts <br /> <br />Pdge 3 <br />8119109 . <br /> <br />The following is a summary of the Claims addressed herein. <br /> <br />Oaim Number <br />daim #4 <br />Claim #5 <br />Oaim #6 <br />Claim #7 <br />Claim #8 <br />Claim #9 <br />Claim # 10 <br />Claim #11 <br />Total <br /> <br />Claim Amount <br />$8,000.00 <br />$2.6,000.00 <br />$4,000.00 <br />$14,000.00 <br />$(-3,000.00) <br />$( -361.00) <br />$(-1,2.65.00) <br />~22.7.37 <br />$49,601.37 <br /> <br />Aooroved Amount <br />$8,000.00 <br />$2.8,000.00 <br />$4,000.00 <br />$14,000.00 <br />$(-3,000.00) <br />$(-361.00) <br />$(-1,265.00) <br />$227.37 <br />$49,601.37 <br /> <br />If both parties (contractor and owner) are agreeable to the terms of the Engineer's review of the <br />daims as detailed above, we will draft and process a formal change order to incorporate this <br />work into the contract. <br /> <br />Sincerely, <br /> <br />BONESfROO <br /> <br />~0'.:4.. <br /> <br />Mark Statz, PE <br />City Engineer <br />651-604-4709 <br /> <br />Attachments: Work Order No. 3409 <br /> <br />cc: Dallas Larson - City Administrator (Owner) <br />Paul Palzer - Public Works Director (Owner) <br />Chris Long/Ryan Goodman - Bonestroo <br />file <br />