Laserfiche WebLink
<br />Page 1 of 1 <br /> <br />. <br /> <br />HATEM QAMHIEH <br /> <br />From: <br />To: <br />Cc: <br />Sent: <br /> <br />"HATEM QAMHIEH" <qamh1hat@q.com> <br /><dlarson@centervillemn.com> <br /><qamh1 hat@q.com> <br />Friday, July 17, 2009 11 :00 AM <br /> <br />Good Morning, <br /> <br />I just want to thank you for your time you spent with me on the phone on July 15 regarding the construction on <br />Peltier Lake Drive and Clearwater Drive. <br /> <br />Yesterday, on July 16 Forest Lake Contracting cleaned all the material (Storm Culverts, Sand, Class 5 Aggregate, <br />Excavation Material and Water Main Pipe) from the Cull De-Sac. I checked the road surface conditions on <br />Clearwater Drive when I got home from work yesterday; I noticed visible significant damage to the road surface <br />on Clearwater Drive for using the road as Staging area for the project using large equipment and heavy truck <br />load to do their job. I would appreciate if you let me know if the Qty or the contractor going to fIX these visible <br />damage's. <br /> <br />Thanks, <br /> <br />Hatem Qamhieh <br />7251 Clearwater Drive <br />Centerville, MN 55038 <br /> <br />9/22/2009 <br />