My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-02-03 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
1998
>
1998-02-03 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2009 2:27:20 PM
Creation date
10/13/2009 2:26:04 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />JRN-30-1998 09:55 <br /> <br />Mr. Jim March <br />January ~O, 1998 <br />Page Two <br /> <br />SITE PLAN - UTILITY PLAN <br /> <br />· The plat shows a proposed road connection to Oupre Road. This arellls part of the Eagle <br />Pass plat, through an outlot area. A meeting should be scheduled with the developer of the <br />Eagle Pass plat to dlsculS coordination of this proposed road connection. <br />· We recommend a watermain loop project be completed with this development that would <br />inClude looping the wMermain north along Centerville Road to the hydrant at the northwest <br />comer ot the Senior Housing property. A loop connection from the Park TelTllce cul-de-sac <br />to CentervOIe Road would also be desirable due to the length 01 the cul-de-sac and the <br />number 01 lots along Park Terrace. In addition, tne City may consider extending a trunk <br />walen"_in to Center street for a Mure extension east along Center Street. <br />· Other issUQ that should be dlsoulSeCl InclUde potential sidewlIlk and trail routes, the <br />requiPid street section, and issues concerning drain tile. <br /> <br />If the City ohooses to ..seas some of the cost for the walermaln looping to reeldents outside of <br />the plat bounclary, we would need to pub6c1y bid that portion 01 the project and begin the 429 <br />assessment proceu. <br /> <br />We will be, in attendance at the February 3" Planning an<l Zoning Commission meeting to <br />discuss this plat and anawer any quations you may have. We will also be in lIltendance at the <br />February 11 ", City Council meeting to discuss issues related to looping the watermaln. <br /> <br />Sincerely , <br /> <br />. ~rd R. Gneen Company <br /> <br />J)OJv...i,,-~ <br />Oavld E. Nyberg, P.E. <br />Project Manager <br /> <br />OEN:tw <br /> <br />co: Mr Rick Carlson, Richard Carlson & Associates, Inc. <br /> <br />O;~r.j\2_\Il8i.3DQ7JM <br /> <br />Howard R, Green Company <br />O:IPROJI26OOB9m1Oll9.3007.j...doo; CONSULTING ENGINEERS <br /> <br />P.03/03 <br /> <br />lOTi'lL P.03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.