Laserfiche WebLink
<br />proper drainage. Also, the Holiday property is adjacent to Lot 1, of the proposed development. <br />Mr. Buechler commented the drainage has been addressed and will not affect the property at 1295 <br />Mound Trail. Mr. Peterson stressed the bad soils in the area and suggested soil borings on each <br />lot and prior to building permit approval. <br /> <br />Ms. Broussard-Vickers noted a potential concern with draining from lot 5 onto lot 4, and she <br />noted item #5 of the Public Works Directors/Building Officials comments. <br /> <br />#5. "The proposed drainage swale in the roadway ditch doesn't meet with the City's <br />requirements of a 1 % minimum grade." <br /> <br />Mr. Peterson suggested a drainage swale between lot 5 and west of the existing lots. <br /> <br />Mr. Rod Holhizer (7193Mound Trail) questioned the Developer about the slope between lot 5 <br />and his lot and hoped that no future drainage problems would occur. <br /> <br />Mr. Lloyd Drilling (7185 Mound Trail) addressed and questioned the Commission in regards to <br />the Mound Trail and its condition, who owns and maintains the road and who is responsible for <br />road repair. Furthermore, he confirmed an RCWD permit is required and that a Saint Paul <br />Utilities (City of St. Paul) permit is not required. <br /> <br />Mr. Holhizer had a point of information considering this house is located in the City ofLino <br />Lakes, his mail box is in the City of Centerville and his mailing address is in the City of Hugo - <br />will the cities consider redesigning the corporate boundaries or annexing the last two lots on <br />Mound Trail. <br /> <br />Mr LaMotte moved to close the public hearing. Ms. Broussard-Vickers seconded the motion. <br />Motion carried unanimously. <br /> <br />Special Use Permit for Tim Peppenger - Operate an Auto Electrical Repair Shop <br />Mr. Tim Peppenger (7129 20th Avenue North) was present to request a special use permit <br />recommendation from the Planning and Zoning Commission to the CouncilO. Chair Welk <br />confirmed traffic and parking would not hinder the area businesses. She also confirmed the <br />business hours will be from 8:00 a.m. to 6:00 p.m. Mr. March confirmed Mr. Peppenger would <br />not have exterior storage and adequate parking was available <br /> <br />Mr. LaMotte moved to close the public hearing Ms. Broussard-Vickers seconded the motion. <br />Motion carried. <br /> <br />A variance - Road to be over 800' in Length with a Temporary Cul-de-sac <br />Mr. Thomas Peterson (City Engineer) updated the Commission on the proposed variance. He <br />suggested the cul-de-sac be constructed at 60' (right-of-way) because the north property may not <br />afford a road to be constructed <br /> <br />2 <br />