My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-23 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2009
>
2009-11-23 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 2:48:58 PM
Creation date
11/19/2009 2:48:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City ofCenterville <br /> Page 3 <br /> iF Trail Grant 7117/09 <br /> The following shows the justification for the costs of each item: <br /> Additional Easements /ROW <br /> Previous proposal had 15 easements = $9,200 This is $613 /easement. Figuring 5 additional full <br /> easements and 5 half easements (sketches only) = 7.5 easements x $613 /easement = $4,600 <br /> Additional Meetings <br /> Preparation, attendance and follow -up = 4 hours per meeting at $126 /hour = $504 per meeting <br /> x 2 mtgs, = $1008 plus printing and mileage expenses = $1,200. <br /> At most of the meetings, both Mark Statz and Geoff Martin (Landscape Architect) attended. Mark <br /> felt this was prudent to ensure strong communication with the parks committee. Our initial <br /> proposal did not account for two attendees at each meeting. We are NOT asking for additional <br /> compensation for this practice. <br /> Fountain Mechanical <br /> See attached proposal from an outside consultant. <br /> Coordination time of approximately 4 hours ( +/- $500) is necessary to meet with the <br /> subconsultant and provide them with the necessary infomiation needed to prepare their proposal <br /> and guide them through the design. <br /> Schedule <br /> Below is the updated schedule for activities leading up to the bid. <br /> Submit Final Plans to Anoka County for Review December 2009 <br /> Submit Final Plans to MNDOT January 2010 <br /> Receive "ROW Certificate" March 2010 <br /> MNDOT Approves Plans for Submittal to Feds March 2010 <br /> Open Bids May 2010 <br /> Sincerely, <br /> BONESTROO <br /> Mark Statz, PE <br /> City Engineer <br /> 651- 604 -4709 <br /> copy: ELM, CWL2, RJG — Bonestroo <br /> file <br />
The URL can be used to link to this page
Your browser does not support the video tag.