My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-03-12
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1997
>
1997-03-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2009 8:37:39 AM
Creation date
12/21/2009 8:37:18 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Hugo <br /> 5524 Upper 146th Street North • Hugo, MN 55038 -9367 <br /> Phone (612) 429 -6676 • Fax (612) 426 -2859 <br /> FEB . 0 7 1 . <br /> February 4, 1997 <br /> Cities of Townships of <br /> Lino Lakes Columbus <br /> ..-Centerville Forest Lake <br /> White Bear Lake White Bear Lake <br /> Forest Lake Grant <br /> Subject: Peltier Lake Dam <br /> Ladies and Gentlemen: <br /> The City of Hugo recently sent the enclosed letter to the Rice Creek Watershed District <br /> supporting an operations study of the SL Paul Water Utility Dam on Peltier Lake in <br /> Centerville. As you are probably aware, The SL Paul Water Utility used Peltier Lake and <br /> adjacent water bodies as a source of fresh water for a number of years. The dam <br /> controls the flow of water out of the lake, and thus from Hardwood, Clearwater and upper <br /> Rice Creeks as well. Concems have been expressed that the dam has been keeping <br /> water levels at unusually high levels, and causing flooding along the tributary creeks. <br /> Though the flooding Issue does not directly impact the City of Hugo, the management <br /> practices of the dam do. The ability of Rice Creek to handle the stormwater run -off from <br /> a large part of Hugo, Forest Lake, Centerville, Grant, Columbus Township, White Bear <br /> Lake and Lino Lakes is dictated by operation of the dam. Given the rapid development <br /> in the watersheds, the dam could become an issue of contention in the future as the <br /> volume of water passing through Peltier Lake increases. The City of Hugo believes that <br /> it would be beneficial for all involved to define an updated operating plan for the dam <br /> note. <br /> The City of Hugo encourages the cities and townships with land draining into Peltier Lake <br /> to support a study of the operations of the dam by the St. Paul Water Utility and the <br /> RCWD by forwarding letters of support to the District. <br /> FOR THE CITY COUNCIL <br /> Si rely, <br /> ‘71( <br /> usd6 1444., <br /> City Administrator <br /> RAM:DAM2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.