My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-02-12
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1997
>
1997-02-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2009 9:00:18 AM
Creation date
12/21/2009 8:59:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
el <br /> r <br /> PARTIAL PAYMENT ESTIMATE <br /> NO. 10 <br /> FROM: SEPTEMBER 14, 1996 <br /> TO: JANUARY 29, 1997 <br /> CONTRACTOR: REHBEIN, INC. <br /> ADDRESS: P.O. BOX 324, HUGO, MN 55038 <br /> OWNER: CITY OF CENTERVILLE, MINNESOTA <br /> PROJECT: ACORN CREEK (260- 047 -30) <br /> COMPLETION DATE AMOUNT OF CONTRACT: <br /> ORIGINAL: NOVEMBER 27, 1993 ORIGINAL: $ 528.19330 <br /> REVISED: REVISED: $ 590,555.30 <br /> C01:0ACT F.Ff,MS. THffi PERIOD TOTAI : 1 <br /> 2i DnCRIf1ON OINW QTt' UNIT 4e• AM43i19r QTY 4fl0L'NT". <br /> PR[C$ <br /> $CHRDIII.F 1.0 - SANITARY SFWFJ <br /> 1 8" PVC (10 -12') LE 1056 83.00 0 0.00 1056 13,728.00 <br /> 2 10' PVC (16 -18') LF 246 25.03 0 0.00 246 6,150.00 <br /> 3 10' PVC (18-20') LF 180 25,00 0 0.00 180 4,500.00 <br /> 4 10' PVC (20.22') LF 180 25,00 0 0.00 180 4.500.00 <br /> 5 10 PVC (22 -24') LF 195 25.00 0 0.00 195 4,875.00 <br /> 6 8' x4' SERVICE WYE EA 27 50.00 0 0.00 23 1,150.00 <br /> 7 C SERVICE PIPE LF 1080 7.00 0 0.00 1250 8,750.00 <br /> 8 STANDARD MANHOLES EA 8 1,000.00 0 0.00 8 8,000.00 <br /> 9 MANHOLE EX. DEPTH ( >8') • LF 55 70.00 0 0.00 51 3,570.00 <br /> 10 CONN. TO EXIST. MH'S EA 3 1,150.00 0 0.00 3 3,450.00 <br /> 11 GRANULAR FOUNDATION (CV) CY 300 6.00 0 0.00 270 L620.00 <br /> 12 OUTSIDE DROP (>2') LF 14.5 200.00 0 0.00 14.5 2,900.00 <br /> 13 IN -PLACE DENSITY EA 18 30.00 0 0.00 12 360.00 <br /> 14 10' x 4" SERVICE WYE EA 11 5000 0 0.00 11 550.00 <br /> T SCHEDULE 1.0 SANITARY SEWER -TOTAL 0.00 64 10300 <br /> SCHF.DIILF. 2.0 WATERMAIN <br /> 1 - CONN. TO EXISTING WATERMAIN EA 5 300.00 0 0.00 3 900.00 <br /> 2 6' PVC WATERMAIN LF 1165 8.00 0 0.00 1141 9,128.00 <br /> 3 8' PVC WATERMAIN LF 1381 8.00 0 0.00 1436 11,488.00 <br /> 4 8' DIP LF 20 30.00 0 0.00 20 600.00 <br /> 5 HYDRANT W/ VALVE EA 4 1,500.00 0 0.00 4 6,000.00 <br /> 6 6' VALVE EA 2 400.00 0 0.00 2 800.00 <br /> 7 8' VALVE EA 2 500.00 0 0.00 2 1,000.00 <br /> 8 FITTINGS LBS 2840 2.00 0 0.00 2130 4260.03 <br /> 9 I" SERVICE CONNECT EA 27 150.00 0 0.00 33 4,950.00 <br /> 10 1' SERVICE PIPE LF 1080 5.00 0 0.00 1180 5,900.00 <br /> 11 4" INSULATION SF 160 3.00 0 0.00 160 480.00 <br /> 12 HYDRANTRELOCATE EA 1 600.00 0 0.00 1 600.00 <br /> 13 GRANULAR FOUNDATION (CV) CY 400 6.00 0 0.00 376 2,256.00 <br /> I4 IN -PLACE DENSITY EA 15 30.00 0 0.00 12 360.00 <br /> T SCHEDULE 2.0 WATERMAIN-TOTAL 0.00 48,722.00 <br /> SCHEDJ 0.E 3.0 - STORM DRAINAGE <br /> I REMOVE EXIST 46' CMP LF 50 35.00 0 0.00 0 0.00 <br /> 2 12' RCP, CL 111 LF 500 21.00 0 0.00 524 11,004.00 <br /> 3 15' RCP, CL H) LF 335 23.00 0 0.00 335 7,705.00 <br /> 26004710.XLS Page 1 260-047 -30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.