| 
								     r     	A
<br />					     	<				C0.N'. - ''WGTXTEMB		  	T' 1 '016D6A	     	YQ:tAL'FIIDA.3'6
<br />		 	EL92    	"															  	.
<br />			IT
<br />			NiF	 	x		DP.St:1 t flON			UNER				  	Q7`Y		h,U051N€	 	QTY		AFIDYN
<br />				..							 	. '  YR10E.
<br />		 	4     	18' RCP, CL 01			    	LF	  	31	    	24.00	     	0	 	0.00	     	31		744,00
<br />		 	S    	21' RCP, CL III			    	LF	 	160	    	27.00	     	0	 	0.00	    	153     	4,131.00
<br />		 	6    	21' RCP F.E.S., CL 111				EA	   	1	    	425.00	     	0	 	0.00			1		425.00
<br />		 	7     	12' RCP F.E.S., CL 111 (SEE 817)	     	EA    	'     	2	   	375.00	     	0	 	0.00			1		375.00
<br />		 	8    	88' SPAN RCP, CL III				LF		226.5	    	100.00	     	0	 	0.00	   	226.5    	22,650.00
<br />		 	9    	88' RCP SPAN F.E.S., CL III		  	EA	  	2	  	1,000.00	     	0	 	0.00	     	2     	2,000.00
<br />		 	10    	48' STORM SEWER MANHOLE			EA	  	3	   	500.00	     	0	 	0.00	     	3     	1,500.00
<br />		 	11     	STANDARD CATCH BASIN		  	EA	  	8	   	800.00	     	0	 	0.00	     	8     	6,400.00
<br />		 	12    	RIP RAP (CL 1I)			    	CY	 	120	    	35.00	     	0	 	0.00	    	107     	3,745.00
<br />		 	13    	RIP RAP (CL 111)			   	CY	  	55	    	30.00	     	0	 	0.00	     	98     	2,940.00
<br />		 	Id    	GRANULAR FOUNDATION (CV)	     	CY	 	400	     	5.00	     	0	 	0.00	    	398     	1,990.00
<br />		 	15    	BAFFLED WEIR			   	LS	   	1	  	1,200.00	     	0	 	0.00			1     	1,200.00
<br />		 	16    	1N-PLACE DENSITY			 	EA	  	6	    	30.00	     	0	 	0.00	     	3	 	90.00
<br />		 	17    	DIFFUSER (CHANGE FROM 17)			EA	   	1	   	500.00	     	0	 	0,00	     	1		500.00
<br />		 	T    	SCHEDULE 3.0 STORM DRAINAGE -TOTAL							  	0.00		    	67,399.00
<br />		     	SCHEDULE 4.0 - STREET CONSTRUCTION
<br />		 	1     	REMOVE EXIST. BIT. PAVEMENT	    	SY		2400	     	2.25			0	 	0.00	   	2400     	5,400.00
<br />		 	2    	SALVAGE GUARD RAIL		    	LS	 	500	   	200.00	     	0	 	0.00	     	1		200.00
<br />		 	3    	SUBGRADE PREPARATION		 	RDSTA     	38.1	    	98.00	     	0	 	0.00	    	381    	37,338.00
<br />		 	4    	GEOTEXTILE FABRIC		     	SY		16500	     	0.90	     	0	 	0.00	   	16435    	14,791.50
<br />		 	5    	SELECT GRANULAR BORROW (CV)	   	CY		9400	     	2.50	     	0	 	0.00	   	9400    	23,500.00
<br />		 	6    	CLASS 5 AGGREGATE BASE		 	TN		5780	     	5.33			0	 	0.00	 	4826.24    	25,723.86
<br />		 	7    	BIT. TYPE 31 BASE COURSE		 	TN	 	1570	    	18.43			0	 	0.00	  	1749.07    	32,235.36
<br />		 	8    	BIT, TYPE 41 WEAR COURSE		 	TN	 	1310	    	20.70  ,	    	0	 	0.00	  	1378.17    	28,528.12
<br />		 	9    	BITUMINOUS TACK COAT		  	GAL	 	700	     	1.20	     	0	 	0.00	    	700		840.00
<br />		 	10    	SURMOUNTABLE CONC. C & G	     	LF		7830	     	4.80	     	0	 	0.00	   	7761    	37,252.80
<br />		 	11    	CONCRETE VALLEY GUTTER			SF	 	275	     	3.50	     	0	 	0.00	    	180		630.00
<br />		 	12    	TRIANGULAR VALLEY GUTTER	     	EA	  	2	   	600.00			0	 	0.00	     	2     	1,200.00
<br />		 	13    	4' PERFORATED DRAIN TILE		 	LF		8070	     	1.25			0	 	0.00	   	8070    	10,087.50
<br />		 	14    	STOP SIGN					EA	  	5	    	100.00	     	0	 	0.00	     	5		500.00
<br />		 	15    	4' CONCRETE SIDEWALK		   	SF		11400	     	1,70			0	 	0.00	   	2855     	4,853.50
<br />		 	16    	6' CONCRETE SIDEWALK		   	SF	 	1280	     	2,20	     	0	 	0.00	     	80		176.00
<br />		 	17    	PEDESTRIAN RAMPS				EA	  	5	    	130.00	     	0	 	0.00	     	2		260.00
<br />		 	18    	SIIRGRADE IN -PLACE DENSITY	     	EA	  	16	    	30.00			0	 	0.00	     	11		330.00
<br />		 	19    	SUBGRADE PROCTOR		     	EA	   	1	    	80.00			0	 	0.00	     	1	 	80.00
<br />			20    	CLASS 5 GRADATION		     	EA	  	3	    	80.00	     	0	 	0.00	     	3		240.00
<br />			21    	CLASS 5 PROCTOR			 	EA	   	1	    	80.00			0	 	0.00	     	1	 	80.00
<br />			22    	CLASS 5 IN -PLACE DENSITY		 	EA	  	8	    	30.00	     	0	 	0.00	     	8		240.00
<br />			23    	CONCRETE CYLINDER (3 EA.)			EA	  	14	   	140.00	     	0	 	0.00	     	6		840.00
<br />			24    	BIT, EXTRACTION & GRADATION	    	EA	  	14	   	225.00	     	0	 	0.00	     	0	 	0.00
<br />			25    	BIT.  AIR VOIDS			   	EA	  	14	   	180.00	     	0	 	0.00	     	0	 	0.00
<br />		 	T    	SCHEDULE 4.0 STREET CONSTRUCTION -TOTAL						    	0.00		   	225.326.64
<br />		     	SCHEDULE LO SITE WORK AND GRADING
<br />		 	1    	CLEAR & GRUB			   	AC	  	2	  	2,800.00	     	0	 	0.00	     	2     	5,600.00
<br />		 	2    	COMMON EXCAVATION		   	CY		89160	     	1.25	     	0	 	0.00	   	89160    	111,450.00
<br />		 	3    	SILT FENCE			     	LF		2925	     	1.40	     	0	 	0.00	   	1849     	2,588.60
<br />		 	4    	SEEDING				 	AC	 	17,5	   	400.00	     	0	 	0.00	    	17.5     	7,000.00
<br />		 	5    	BALE CHECKS			    	EA	  	20	     	2.00	     	0	 	0.00	     	0	 	0.00
<br />		 	6    	AMERICAN LINDEN, 1' CAL, BR	    	EA	  	15	    	65.00	     	0	 	0.00	     	15		975.00
<br />		 	7    	NIOBE WEEPING WILLOW, 1' CAL, BR		EA	  	12	    	65.00	     	0	 	0,00	     	15		975.00
<br /> '		 	8    	RED MAPLE. 1' CAL, BR		   	EA	  	7	    	65.00	     	0	  	0.00	     	7		455.00
<br />		 	T    	SCHEDULE 3.0 SITE WORK AND GRADING -TOTAL						  	0.00		   	129,043.60
<br />			26004710.XLS						     	Page 2							 	260-047 -30
<br />
								 |