TABLE 2 <br /> SANITARY SEWER COSTS <br /> Construction Costs <br /> Restoration 27,500.00 <br /> Trunk Sanitary Sewer including services 161,100.00 <br /> Total Construction Cost $188,600.00 <br /> Overhead Costs <br /> Administration 1.00% 1,886.00 <br /> Engineering 7.50% 14,145.00 <br /> Legal 1.50% 2,829.00 <br /> Construction Administration 2.00% 3,772.00 <br /> Inspection 7.00% 13,202.00 <br /> Staking 2.00% 3,772.00 <br /> Bonding and Finance 4.00% 7,544.00 <br /> Contingencies 10.00% 18,860.00 <br /> Total Overhead Costs 35.00% $66,010.00 <br /> TOTAL PROJECT COSTS $254,610.00 <br /> ASSESSMENTS <br /> Two options to assess the properties adjacent to 20th Avenue are shown in the following tables. <br /> Each table has two columns representing the amount assessed to each property owner. The first <br /> set of costs is based on area in acres for each lot. The second set of costs is based on the front <br /> footage for each lot. Table 3 shows the assessment rates based for the Watermain Interconnection. <br /> Table 4 shows the assessment rates based for the Sanitary Sewer. <br /> FEAS- 260.085 -6- 260- 085 -11 <br />