Laserfiche WebLink
TABLE 3 <br /> ASSESSMENTS FOR WATERMAIN INTERCONNECTION <br /> West of 20th Avenue Area @$1,835 /ac FF @$41.55/FF <br /> Clearwater Meadows Outlot Commercial 4.7 8,624.50 690 28,669.50 <br /> Lake Area Utilities Commercial 17.6 32,296.00 650 27,007.50 <br /> Kenko "A" Commercial 2.9 5,321.50 350 14,542.50 <br /> Kenko "B" Commercial 1.7 3,119.50 220 9,141.00 <br /> Carpenter Commercial 5.0 9,175.00 320 13,296.00 <br /> Reel Manufacturing Commercial 3.6 6,606.00 340 14,127.00 <br /> Rehbein Inc "A" Commercial 6.6 12,111.00 380 15,789.00 <br /> Rehbein Inc "B" Commercial 6.6 12,111.00 100 4,155.00 <br /> Rehbein Inc "C" Commercial 1.2 2,202.00 160 6,648.00 <br /> East of 20th Avenue <br /> Sheehy Industrial 18.1 33,213.50 650 27,007.50 <br /> Herman Strelow Industrial 21.1 38,718.50 675 28,046.25 <br /> Joyce Stevens Industrial 21.1 38,718.50 675 28,046.25 <br /> Gerald Rehbein Industrial 38.4 70,464.00 1350 56,092.50 <br /> Total Properties Assessment $272,681.00 $272,568.00 <br /> Total City's Cost $98,300.00 $98,300.00 <br /> TOTAL ASSESSMENT $370,981.00 $370,868.00 <br /> TOTAL PROJECT COST $370,575.00 $370,575.00 <br /> The City's costs were estimated for the cost of oversizing the watermain and the metering vault <br /> at the Interconnect to Lino Lakes. <br /> FEAS - 260.085 -7- 260-085-11 <br />