Laserfiche WebLink
-2- <br /> Calculations must be submitted along with a grading and erosion control plan <br /> that delineates the drainage areas for this site. The post- developed rate /volume <br /> of runoff must not exceed the pre - developed rate /volume of runoff for the <br /> 5 -year, 24 -hour storm, utilizing the "SCS Method," with a curve number <br /> determined using Group C soils as a minimum. <br /> An access permit and a permit for work within the County Right -of -Way is <br /> required and must be obtained prior to the commencement of any construction. <br /> Contact Roger Butler, Traffic Engineering Coordinator for this department, for <br /> further information regarding the permit process. <br /> Thank you for the opportunity to comment. Feel free to contact me if you have any <br /> questions. <br /> Sincerely, <br /> 1 /4/6 <br /> Jane Pemble <br /> Traffic Engineer <br /> \e: Roger Butler, Traffic Engineering Coordinator <br /> xc: Skip Anderson, County Surveyor <br /> xc: Roger Winberg, City of Centerville <br /> dmh /1NORFOR <br />