My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-02-24
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1999
>
1999-02-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2009 12:50:29 PM
Creation date
12/21/2009 12:50:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eeintr•c, panne. Auden% and Aaacciofet lac re ea APPeterr a Acton/Eye OpMnuni ' Employer <br /> pppp��ie�� rr nt Pnnclpaia: Oa• Banatroo, P.E. n Joseph C Andenik, P.E. n Mann: 1. Servers, PE <br /> ©ones `Cova Richard E Tart, P,E. t Glenn R Cook, P E. ;t Robert Q ScPurv6N, P.E. , Jer.y A. Boutetr,, P E. n <br /> Rosene Pcsb•n W. Rnen. P.E. end Sum, M. EWWIn, C.P.A . >snior Consultant. <br /> ALaatON* Prinelp$M Howard A Banked. P.P. n )(win A. Gordan, P E. n Robert A. FHNsee, P.E n <br /> A r „�� de M � ' M 1k ' & & Rkheed W. rant, P.E. n Oada O beret*, P E n P,bsn C Ratang, A.I.A it Mark A. h ns <br /> aon, D.E. n <br /> I1 mahaii T . Reulthara RE, n Ted S. Floe C.E. n Kennetn P Anderinn, P.E I; Mari R Rofs, F g <br /> Sldray P. Wellereson, P E.. c.B. 11 Rene Ran F. Kawritn 11 Agnes M Ring 0 Mchael P. Pa¢ P E <br /> Associates . tt <br /> V VVV \ pu.n Rick Schnuck. P.E. <br /> Mot Sk. Peet Rochester. Wenner er and 51 Clael. MN n Mliweekae. WI <br /> Engineers & Architects <br /> WEEK IN REVIEW <br /> ENGINEERING ISSUES <br /> CITY OF CENTERVILL.E <br /> February 8, 1999 to February 19, 1999 <br /> BRA File No, 616 -GEN <br /> PROJECTS IN CONSTRUCTION <br /> SCHOOL CROSSING AHEAD —FLASHER SYSTEM ON CSAIT 14 <br /> • The lights were programmed and became operational on February 5, '1999. <br /> PROJECTS IN DESIGN <br /> WATER INTERCONNECT <br /> • A meeting was held on February 16 with City Staff and Lino Lakes engineer John Powell. <br /> Details were worked out regarding the proposed connection to Lino Lakes water system. A <br /> revised cost estimate will be presented at the February 24 " Council meeting. <br /> APPLE TREE SQUARE <br /> • Revised plans are being reviewed for compliance to City Standards. <br /> MET COUNCIL SANITARY INTERCEPTOR <br /> • Preliminary plans of this proposed project were submitted and reviowcd. Comments were sent <br /> back to MCES. Construction is expected to begin in September 1999, <br /> 2335 West Highway 38 n St. Paul, MN 3511311 851- 835.4600II Fax: 651.536 -1311 <br />
The URL can be used to link to this page
Your browser does not support the video tag.