Laserfiche WebLink
Contract Unit Quantity Amount <br /> No. Item Unit Quantity Price to Date to Date <br /> Schedule 1.0 Site Work <br /> 1 Salvage topsoil (CV) CY 400 3.5 400 $1,400.00 <br /> 2 Topsoil borrow (CV) CY 400 6 $0.00 <br /> 3 Seeding AC 0.5 450 0.94 $423.00 <br /> 4 Mulching AC 0.5 105 0.94 $98.70 <br /> 5 Sodding SY 3500 2 535 $1,070.00 <br /> 6 Silt fence LF 2000 2 $Q00 <br /> 7 Foundation removal LS 1 650 1 $650.00 <br /> Total Schedule 1.0 Site Work $3,641.70 <br /> Schedule 2.0 Street Construction <br /> 8 Remove bituminous driveway SY 150 2.5 $0.00 <br /> 9 Salvage driveway aggregate CY 7 5 $0.00 <br /> 10 Subgrade preparation RDSTA 22 150 22 $3,300.00 <br /> 11 Modified select granular borrow (P) CY 6000 8.5 6000 $51,000.00 <br /> 12 Geotextile fabric SY 10300 1 9722 $9,722.00 <br /> 13 Mill bituminous pavement SY 30 12 $0.00 <br /> 14 Shouldering aggregate, Class 2 TON 10 20 $0.00 <br /> 15 Aggregate base, Class 5 TON 3275 8.5 3044 $25,874.00 <br /> 16 Type 41A, wear course mixture TON 775 31 $0.00 <br /> 17 Type 31B, base course mixture TON 775 30 785 $23,550.00 <br /> 18 Bituminous material for tack coat GAL 400 1.1 50 $55.00 <br /> 19 Concrete curb and gutter, surmountable LF 4385 6.5 4386 $28,509.00 <br /> 20 Bituminous driveway restoration 5Y 115 10 69 $690.00 <br /> 21 4' concrete sidewalk SF 5300 2 $0.00 <br /> 22 Subgrade density test, inplace EA 20 40 $0.00 <br /> 23 Class 5, gradation test EA 2 65 $0.00 <br /> 24 Class 5, proctor test EA 2 85 $0.00 <br /> 25 Class 5, density test, inplace EA 10 40 $0.00 <br /> 26 Concrete testing EA 7 135 $0.00 <br /> 27 Bituminous core density testing EA 6 350 $0.00 <br /> Total Schedule 2.0 Street Construction $142,700.00 <br /> Schedule 3.0 Bituminous Trail Construction <br /> 28 Subgrade preparation RDSTA 4 180 4 $720.00 <br /> 29 Aggregate base, Class 5 TON 175 9.5 175 $1,662.50 <br /> 30 Type 41, bituminous mixture for paths TON 45 55 60 $3,300.00 <br /> Total Schedule 3.0 Bituminous Trail Construction $5,682.50 <br /> Schedule 4.0 Storm Sewer Construction <br /> 31 Remove 12" CMP LF 40 5.5 $0.00 <br /> 32 15" CMP LF 85 15.6 46 $717.60 <br /> 33 15" RCP, Class V LF 250 20.15 192 $3,868.80 <br /> 34 18" RCP, Class 111 LF 35 22 197 $4,334.00 <br /> 35 21" RCP, Class 111 LF 365 24.5 354 $8,673.00 <br /> 36 24" RCP, Class 111 LF 240 26.6 206 $5,479.60 <br /> 37 30" RCP, Class III LF 350 37.4 $0.00 <br /> 38 24" x 36" catch basins EA 7 850 8 $6,800.00 <br /> 39 Standard storm manhole EA 3 1130 3 $3,390.00 <br /> 40 54" diameter storm manhole EA 2 1665 2 $3,330.00 <br /> 41 24" RCP apron w/trash guard EA 1 675 2 $1,350.00 <br /> 42 30" RCP apron w/trash guard EA 1 995 $0.00 <br /> 43 15" RCP safety apron EA 2 615 2 $1,230.00 <br /> 44 Rip rap, Class III TON 6 50 6 $300.00 <br /> 45 20:1 storm sewer subgrade taper LF 200 6 $0.00 <br /> 46 Concrete catch basin collar EA 7 70 $0.00 <br /> 47 Concrete manhole collar EA 5 70 $0.00 <br /> 48 Standard proctor EA 3 85 $0.00 <br /> 49 Inplace density EA 15 40 $0.00 <br /> Total Schedule 4.0 Storm Sewer Construction $39,473.00 <br /> Requestaids <br />