Contract Unit Quantity Amount <br /> No. Item Unit Quantity Price to Date to Date <br /> Schedule 5.0 Water Main Construction <br /> 50 Connect to existing water main EA 1 320 1 $320.00 <br /> 51 6" PVC water main LF 460 14.2 455 $6,461.00 <br /> 52 8" PVC water main LF 1980 16.2 1964 $31,816.80 <br /> 53 12" PVC water main LF 965 24.5 956 $23,422.00 <br /> 54 Fittings LBS 4500 1.7 4915 $8,355.50 <br /> 55 Hydrant w/ gate valve EA 5 2000 5 $10,000.00 <br /> 56 6" gate valve EA 1 425 2 $850.00 <br /> 57 8" gate valve EA 8 570 7 $3,990.00 <br /> 58 12" valve EA 2 760 1 $760.00 <br /> 59 Valve rod extension EA 11 95 $0.00 <br /> 60 1" service connection w/ curb stop EA 48 150 38 $5,700.00 <br /> 61 1" copper service pipe LF 1095 5.3 1440 $7,632.00 <br /> 62 Directional bore 1" copper service pipe LF 400 25 100 $2,500.00 <br /> 63 Jack -bore 18" steel casing pipe LF 80 125 120 $15,000.00 <br /> 64 Granular foundation material CY 600 0.01 100 $1.00 <br /> 65 Granular bedding material CY 600 0.01 $0.00 <br /> 66 Standard proctor EA 3 85 2 $170.00 <br /> 67 Inplace density EA 20 40 5 $200.00 <br /> Total Schedule 5.0 Water Main Construction $117,178.30 <br /> Schedule 6.0 Sanitary Sewer Construction <br /> 68 Reconstruct manhole LS 1 550 1 $550.00 <br /> 69 8" PVC (0' -8' deep) LF 675 15 845 $12,675.00 <br /> 70 8" PVC (8' -10' deep) LF 955 16 1000 $16,000.00 <br /> 71 8" PVC (10' -12' deep) LF 200 17 200 $3,400.00 <br /> 72 8" PVC (12' -14' deep) LF 230 18 230 $4,140.00 1 <br /> 73 Sanitary manhole 0' -8' deep EA 10 1270 10 $12,700.00 <br /> 74 Manhole extra depth (>8' deep) LF 20 80 20 $1,600.00 <br /> 75 Concrete manhole collar EA 10 70 $0.00 <br /> 76 Adjusting ring EA 10 20 $0.00 <br /> 77 Construct outside drop EA 1 1000 1 $1,000.00 <br /> 78 Outside drop extra depth ( >2 feet) LF 5 . 140 5 $700.00 <br /> 79 8" x 4" wye EA 43 40 32 $1,280.00 <br /> 80 4" PVC service pipe LF 1604 5 1357 $6,785.00 <br /> 81 Granular foundation material CY 400 0.01 100 $1.00 <br /> 82 Granular bedding material CY 400 0.01 $0.00 <br /> 83 Standard proctor EA 3 85 1 $85.00 <br /> 84 Inplace density EA 25 40 5 $200.00 <br /> Total Schedule 6.0 Sanitary Sewer Construction $61,116.00 <br /> Alternate B - Meadow Lane Street and Utility Extension <br /> 85 Connect to existing drain tile EA 2 340 $0.00 <br /> 86 Subgrade preparation RDSTA 1.6 150 1.6 $240.00 <br /> 87 Modified select granular borrow (P) CY 390 8.5 390 $3,315.00 <br /> 88 Geotextile fabric SY 660 1 660 $660.00 <br /> 89 Mill bituminous pavement SY 15 25 $0.00 <br /> 90 Aggregate base, Class 5 TON 210 12 210 $2,520.00 <br /> 91 Type 41A, wear course mixture TON 50 65 $0.00 <br /> 92 Type 31 B, base course mixture TON 50 60 50 $3,000.00 <br /> 93 Bituminous material for tack coat GAL 25 3 $0.00 <br /> 94 Concrete curb and gutter, surmountable LF 320 6.5 320 $2,080.00 <br /> 95 4" concrete sidewalk SF 910 2 $0.00 <br /> 96 Connect to existing water main EA 1 320 1 $320.00 <br /> 97 8" PVC water main LF 156 14.25 169 $2,408.25 <br /> 98 Fittings LBS 110 1.8 $0.00 <br /> 99 1" service connection w/ curb stop EA 3 150 5 $750.00 <br /> 100 1" copper service pipe LF 85 6.6 203 $1,339.80 <br /> 101 Connect to existing sanitary sewer EA 1 400 1 $400.00 <br /> 102 8" PVC (0' -8' deep) LF 117 19.1 117 $2,234.70 <br /> 103 Sanitary manhole (0' -8' deep) EA 1 1275 1 $1,275.00 <br /> 104 Concrete manhole colar EA 1 70 $0.00 <br /> 105 8" x 4" wye EA 3 40 5 $200.00 <br /> 106 Manhole extra depth (>8' deep) LF 9.5 80 9.5 $760.00 <br /> 107 4" PVC service pipe LF 95 5 289 $1,445.00 <br /> 108 Granular foundation material CY 40 0,01 40 $0.40 <br /> Request4.tds <br />