Laserfiche WebLink
• <br /> 5. Concrete utility pad for the generator <br /> 6. Complete test and start -up by generator representative and Aid Electric <br /> 7. Sound attenuating enclosure to meet low decibel requirements <br /> 8. Overtime figured for shutdown period <br /> 9. Electrical permit fee <br /> For the sum of $30,634.00. <br /> Notes: <br /> 1. All plans and specs to be reviewed by the local electrical inspector <br /> prior to starting any work <br /> 2. Not responsible for locating any on -site underground utilities <br /> 3. Quotation good for 30 days <br /> 4. Changes in the work scope to be at time and material rate <br /> Sincerely, <br /> "7/ <br /> ' • .;-1,„ ':i /' - ; ?t ry <br /> Brian Kovar <br /> Project Manager <br /> cg <br />