Laserfiche WebLink
I I <br /> Aid Electric Service, Inc. <br /> 7101 Highway 65 NE <br /> Fridley, MN 55432 -3302 <br /> (612) 571 -7267 <br /> Fax (612) 571 -4735 <br /> January 8, 1998 <br /> ATTN: Milo Bennet <br /> Fire Chief <br /> Dear Milo, <br /> Provide all labor and material for the following work: <br /> Project 1: Centennial Fire Department <br /> 1. 1 - 80 KVA turbo - charged 120/208 volt 3 -phase diesel generator <br /> _. 1 - 400 amp automatic transfer switch <br /> 3. 1 - 400 amp main disconnect for the service <br /> 4. 200 amp conductors from the transfer switch to the generator <br /> 5. Concrete utility pad for the generator <br /> 6. Complete test and start -up from generator representative and Aid <br /> Electric. <br /> 7. Sound attenuating enclosure to meet low decibel requirements <br /> 8. Overtime labor figured for shutdown period <br /> 9. Electrical permit fee <br /> For the sum of $34,044.00. <br /> Project 2: Centerville Fire Station <br /> 1. 1 - 50 KVA turbo- charged 120/208 volt 3 -phase diesel generator <br /> 2. 1 - 400 amp automatic transfer switch <br /> 1 - 400 amp main disconnect for the service <br /> 4. 100 amp conductors from the transfer switch to the generator <br />