Laserfiche WebLink
Y2K BUG <br /> CITY OF CENTERVILLE <br /> APPROVED <br /> Y2K TEAM MINUTES <br /> Ne <br /> May 13, 1999 <br /> WATER & SEWER: (Continued) <br /> • Anamatic System <br /> • Digimatic II <br /> • DIII Monitor <br /> • A/DIII Monitor <br /> • PID Controller <br /> • Dual Digital Setpoints <br /> • 8 Point Annunciator <br /> • Pump Control Module <br /> • Alternators (2 pump, 3 pump) <br /> • Timers <br /> • Float -Pak Controller <br /> • Guard -Pak Monitor <br /> EMERGENCY: Dave West, Y2K Team Member attended the Anoka County Y2K <br /> Meeting on April 29, 1999, organized by Bruce Wojack, Anoka County Emergency Service <br /> Director. Dave presented the following report including the Y2K status as of 04/29/99: <br /> 1. NSP http: / /www.nspco.com <br /> 98% OK. Now into contingency planning <br /> 2. CONNEXUS ENERGY Manager: alferber@connexusenergy.com <br /> 99% tested. Considered Y2K ready. Contingency planning in the areas of fleet readiness, <br /> supplies, and communications. <br /> 3. GREAT RIVER ENERGY Engineer: skokkinen @GREnergy.com <br /> Power generator for most of the CO -OP distributors in the Twin City area. New equipment <br /> is on line. They input into the MAPP: Mid - America Power Pool. Distribution is automated <br /> as to power control, but in not date sensitive. <br /> 4. MINNEGASO http: / /www.minnegasco.com <br /> Similar comments. Distribution is not date sensitive <br /> 5. METROPOLITAN AIRPORTS COMMISSION <br /> Primarily doing contingency planning. <br /> 6. US WEST http: / /www.uswest.com/year2000/ <br /> Switching equipment 97% ready. 100% by June 1, 1999. Disaster drills are run <br /> continuously. Equipment measures only elapsed time. Believe the volume of New Years <br /> calls will be the biggest problem. <br /> 7. METROPOLITAN 911 BOARD Director: npollock@minn.net <br /> They coordinate a dedicated network through 16 different telephone companies. Expect <br /> system will work. <br /> 8. ANOKA COUNTY 911 Manager: jjtondin @co.anoka.mn.us <br /> Very date and time sensitive. Operating system upgraded and tested 12/1998. Mobile data <br /> system tested 12/1998. 5% problems. Radio consoles tested OK. 2 -way radios tested OK. <br /> The 911 receiving equipment was upgraded and tested 1/1999. Sirens, Uninterruptable <br /> Power Supplies, generators all tested OK. <br /> 2 <br />