Laserfiche WebLink
- <br /> i. Coordinate with the utility companies to provide for gas main, <br /> telephone lines, cable lines, and power lines to service the <br /> properties developed on the final plat according to the City's joint <br /> trench policy. <br /> ii. Provide seeding and vegetation maintenance and erosion control <br /> over denuded or graded areas and mitigation area. at the City's <br /> direction. <br /> iii. Establish lot corner monumentation within 60 days of grading <br /> completion or within 180 days after filing the final plat, whichever <br /> is sooner. <br /> iv. Provide such street maintenance and control of builder's actions to <br /> maintain roadways clear of mud, soil, and debris to provide safe <br /> driving surfaces. The Developer shall provide street sweeping <br /> within 24 hours of the City's request for such services. <br /> v. Provide for landscaping in accordance with the City ordinances <br /> and other requirements. <br /> The Developer shall accomplish or cause to be accomplished these actions <br /> according to generally accepted trade standards. The Developer will cause <br /> to be furnished to the City a schedule of proposed operations at least five <br /> days prior to commencement of the construction activities. <br /> To the extent possible, the construction vehicles for site grading, streets, <br /> and utilities shall access the site from 20 Avenue across the existing <br /> parking /construction yard of Developer. <br /> b. Site Grading, Street Construction and Building Permits. No certificate of <br /> occupancy shall be issued without installation of bituminous base course <br /> across the front lot line of that property. No building permit shall be <br /> issued for any lot without the finished grading in accordance with the <br /> approved grading plan. Furthermore, only one building permit will be <br /> issued prior to installation of the bituminous base course, which permit <br /> shall be at the discretion of the City, to allow for emergency vehicle <br /> access. <br /> c. Erosion Control. The Developer shall control erosion insuring: <br /> i. The Developer shall submit an erosion control plan, detailing all <br /> erosion control measures to be implemented during construction. <br /> Said plan shall be approved by the City prior to the <br /> commencement of site grading or construction. <br /> 3 <br />