My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-08-25 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1999
>
1999-08-25 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2009 9:27:37 AM
Creation date
12/22/2009 9:27:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii. Erosion and siltation control measures shall be coordinated with <br /> the difference stages of development. Appropriate control <br /> measures as required by the City shall be installed prior to <br /> development when necessary to control erosion. <br /> iii. Land shall be developed in increments of workable size, as <br /> determined by the City, such that adequate erosion and siltation <br /> controls as directed by the engineer can be provided as <br /> construction progresses. The smallest practical area of land, as <br /> determined by the City, shall be exposed at any one period of time. <br /> iv. Where the topsoil is removed, sufficient arable soils shall be set <br /> aside for respreading over the developed area. The topsoil shall be <br /> restored to a depth of at least four (4) inches and shall be of a <br /> quality at least equal to the soil quality prior to development. The <br /> Developer shall also install four (4) inches of topsoil on all <br /> boulevards and seed or sod as approved by the City. The <br /> Developer shall make all necessary adjustments to the curb stops to <br /> bring them flush with the topsoil (before occupancy). All <br /> disturbed areas shall be seeded. <br /> d. Inspection. All of the work shall be under and subject to the inspection <br /> and approval of the City, City Engineer, and where appropriate, any other <br /> governmental agency having jurisdiction. <br /> e. Faithful Performance of Construction Contracts and Letter of Credit. The <br /> Developer will fully and faithfully comply with all terms and conditions of <br /> any and all contracts entered into by the Developer for the installation and <br /> construction of all Private Improvements and hereby guarantees the <br /> workmanship and materials for a period of two years following the City's <br /> final acceptance of the Private Improvements. The Developer agrees to <br /> guaranty for a period of one year the tree plantings required as part of the <br /> Developer's Agreement. Each specific tree guaranty period shall begin <br /> with the planting of each specific tree. Concurrently with the execution <br /> hereof by the Developer, the Developer will furnish to, and at all times <br /> thereafter maintain with the City, a cash deposit, certified check, or an <br /> Irrevocable Letter of Credit, based on one hundred fifty percent (150 %) of <br /> the total estimated cost of the Private Improvements as indicated in <br /> Paragraph 131. The Irrevocable Letter of Credit shall be for the exclusive <br /> use and benefit of the City of Centerville and shall state thereon the same <br /> is issued to guaranty and assure performance by the Developer of all the <br /> terms and conditions of Paragraph B1 of this Development Contract. Such <br /> Letter of Credit may be reduced upon completion and acceptance of the <br /> Private Improvements by the City to an amount deemed adequate by the <br /> City Engineer to cover the two year warranty period described herein. <br /> The City shall have the right during said warrant period to draw on the <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.