My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-08-25 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
1999
>
1999-08-25 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2009 9:27:37 AM
Creation date
12/22/2009 9:27:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CENTERVILLE CITY HALL/PUBLIC WORKS ADDITION ��II <br /> 616.99.111 Bonestroo <br /> 0 Rosene <br /> 8.25.99 Anderlik SE <br /> DRK Associates <br /> ESTIMATING FORM Engineers & Architects <br /> NO. SYSTEM/COMPONENT DESCRIPTION UNITS UNIT COST COST <br /> 3466 sf CII/6000sf PW new <br /> 1860 sf remod <br /> Location Modifier=1.06 Size Modifier= 1.1 Total =1.16 <br /> City Hall New construction 3,466.00 $80.90 $280,399.40 <br /> File mezzanine 320.00 $9.11 $2,915.20 <br /> City Hall Remodel constr. 1,860.00 $20.50 $38,130.00 <br /> $0.00 <br /> Public Works New contraction 6,000.00 $54.51 $327,060.00 <br /> SUBTOTAL - (TOTAL CONSTRUCTION COST) $648,504.60 <br /> Size/Location modifiers 1.16 _ $752,265.34 <br /> Contingency (15 %) 0.15 $97,275.69 <br /> Development Cost (Architect, Survey, Testing...10 %a) 0.10 $64,850.46 <br /> TOTAL PROJECT COST $914,39L49 <br /> CntrvlCityHallPubWksAddEstim.xls 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.