Laserfiche WebLink
Effective 9/5/00 <br /> City of Centerville Ord. #4 <br /> approval, the City Council may instruct the Planning and Zoning Commission to initiate <br /> rezoning to the original Zoning; District by removing the PUD District from the Official Zoning <br /> Map: <br /> Section 180 -230: Amendments. Amendments may be made in the approved final plan <br /> when they are shown to be required by changes in conditions that have occurred since the <br /> final plan was approved or by changes in the Development Policy of the City. <br /> A. Minor changes in the location, sitting, and height of buildings and <br /> structures may be authorized by the City Engineer if requested by <br /> engineering or other unforeseen circumstances. <br /> B. All other changes in use, rearrangement of lots, blocks, and open <br /> space, must be authorized by the City Council under procedures <br /> outlined for amendment of the Zoning Ordinance. <br /> Section 180 -240: Completion. Completion of the PUD shall be certified by the Planning <br /> and Zoning Commission on the Final Development Plan. Thereafter, the use of land and <br /> the construction, modification, or alteration of any buildings shall be governed by the <br /> approved Final Development Plan. Changes may be authorized only under the procedures <br /> provided below: <br /> A. Minor extension, alterations or modifications of existing_ structures may <br /> be authorized by the Planning and Zoning Commission if they are <br /> consistent with the intent and purpose of the final plan and do not <br /> increase the cube of any building or structure by more than ten (10) <br /> percent; and <br /> B. Changes in the use of common open space or the replacement of any <br /> building substantially destroyed which exceeds the intent and <br /> purposes of the Final Development Plan may be authorized only by <br /> amendment to the final development. <br /> Section 180 -250: Site Improvements. At any time following the approval of a <br /> Development Stage Plan by the City Council, the applicant may, pursuant to the <br /> applicable codes of the City applyfor, and the Zoning Administrator may issue, <br /> grading permits for the area within the PUD for which Development Stage Plan <br /> approval has been given. <br /> Section 180 -260: Construction, The construction and provisions of all the common open <br /> spaces and public and recreational facilities which are shown on the Final Development <br /> Plan must proceed at the same phase as the construction of dwelling units. At least once <br /> every six (6) months following the approval of the Final Development Plan, the Zoning <br /> Administrator shall review all of the Building Permits issued for the planned development <br /> and examine the construction which has taken place on the site If he /she shall find that <br /> the rate of construction of dwelling units is greater then the rate at which common open <br /> Page 54 of 62 <br />