Laserfiche WebLink
• <br /> Bonestroo Owner: City of Centerville, 1880 Main St, Centerville, MN 55038 -9794 Date November 8, 20001 <br /> Rosene <br /> 0 Anderlik& Contractor: Penn Contracting, Inc., 13025 Centeral Ave NE, Blaine, MN 55434 <br /> • <br /> • Associates Bond Co.Merchants Mutual, 2100 Fleur Dr., Des Moines, IA 50321 <br /> Engineers &Architects <br /> CHANGE ORDER NO. 1 <br /> LIFT STATION NO. 2 RENOVATION <br /> BRA File No. 616 -99 -112 <br /> Description of Work <br /> Contract Unit Total <br /> No. Item Unit Quantity Price Amount <br /> 1 Connect to existing valve vault LS 1 3700 53,700.00 <br /> 2 Install 6" HDPE forcemain (directional LF 254 63 516,002.00 <br /> bore - Peltier Lake Drive) <br /> 3 Install 6" HDPE forcemain (directional LF 500 63 $31,500.00 <br /> bore - Mill Road) <br /> 4 Fuse 6" pipes at intersection EA 1 2500 52,500.00 <br /> 5 Connect to existing manhole EA 1 1500 51,500.00 <br /> 6 Type 31 bituminous base course TN 25 60 51,500.00 <br /> 7 Bituminous wear course, Type 41 TN 25 70 51,750.00 <br /> 8 Sodding, lawn type SY 50 6 5300.00 <br /> Total Change Order No. 1 558,752.00 <br /> • <br /> Original Contract Amount 568,696.00 <br /> Previous Change Orders 50.00 <br /> This Change Order 558,752.00 <br /> Revised Contract Amount (including this change order) 5127,448.00 <br /> Recommended for Approval by: <br /> BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. <br /> • /1 date: <br /> • <br /> Approved by Contractor: Approved by Owner: <br /> PENN CONTRACTIN INC. CITY OF CENTERVILLE <br /> • <br /> r ,. <br /> cc: Owner - -'� <br /> Contractor <br /> Bonding Company <br /> Bonestroo & Assoc. <br /> change order 1 <br />