My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-04-12 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2000
>
2000-04-12 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2009 9:09:46 AM
Creation date
12/23/2009 9:09:19 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EASEMENTS <br /> Permanent and temporary easements will be necessary along Centerville Road, to install <br /> the deep sanitary sewer. The sewer will be installed in the west boulevard from Center <br /> Street to the south. A 12 -foot wide permanent easement is needed from Larry and Alice <br /> Woiak and from Charles Baumann. Temporary construction easements are also needed <br /> from these two property owners. Small temporary easements may be necessary to extend <br /> service pipes to the right -of -way line for several property owners along Centerville Road <br /> (Greenwadt, Henrich, Zerwas). The developer should secure temporary easement all <br /> along the south side of the Hunters Crossing plat, since grading for the trail will encroach <br /> on the property to the south. <br /> Parcel Permanent Temporary Total <br /> Description Property Easement Easement Estimated <br /> SW IA, Section 23 Owner SF Cost SF Cost Easement Cost <br /> Parcel 13 Baumann 2,400 $1,800 3,000 $300 $2,100 <br /> 6903 Centerville Rd. <br /> Parcel 18 Woiak 1,920 $1,440 2,400 $240 $1,680 <br /> 6923 Centerville Rd. <br /> Parcel 4 Greenwadt 1,500 $150 $150 <br /> 6939 Centerville Rd <br /> Parcel 5 Henrich 300 $30 $30 <br /> 6945 Centerville Rd <br /> TOTAL $3,960 <br /> FUNDING <br /> Assessments are proposed to be levied against the benefitted properties along Centerville <br /> Road. A preliminary assessment roll is included in Appendix B located at the back of <br /> this report. Estimated assessments associated with lateral utility costs along Centerville <br /> Road will be revised based on final project costs. <br /> 1. SANITARY SEWER <br /> The lateral cost of sanitary sewer improvements along Centerville Road is proposed to be <br /> assessed on a front - foot -basis. Lateral costs are defined as the equivalent cost for • <br /> extending 8 -inch diameter pipe at normal depths for residential use. The total cost (Part <br /> A of Appendix A) minus trunk costs (larger pipe, deeper) equal the lateral cost. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.