Laserfiche WebLink
WEI <br /> • <br /> • <br /> Mr. Jim March May 17, 2000 <br /> City of Cenrerville <br /> Page 2 <br /> Option 3. Reconstruct street to 28 feet wide with concrete curb and gutter, geotextile fabric, <br /> and subgrade, draintilc, aggregate base. bituminous surfacing, concrete storm sewer pipe, catch <br /> basin structures, 6 -inch water main and appurtenances. Approximate pavement life: 15-20 years. <br /> 'Total Construction Cost $220,000.00 <br /> There are 12 residential properties that have frontage on Heritage Street and LaMotte Drive (total <br /> 1350 feet). The Church has 900 feet and Public Works 240 feet of frontage, as shown on the <br /> attached map. The south 400 feet of street has the MCES Lift Station and LaMette Park on the <br /> east and vacant property on the west. The City of Lino Lakes was contacted regarding <br /> reconstruct of LaMotte Drive and additional streets in the neighborhood to the west. Lino Lakes <br /> has this area scheduled for street reconstruction in 2002. <br /> We would be pleased to prepare a Feasibility Report for the work described. The study would <br /> include total reconstruct and utilities listed in Option 3. We propose to do this study at a not -to- <br /> exceed cost of $7,000.00. Please let us know if you want us to proceed with scheduling this <br /> work. <br /> Please call this office with questions at 651 - 604 -4868. <br /> Yours very truly, <br /> BONESTROO, ROSFNE, ANDERLIK & ASSOCIATES, INC, <br /> lizerriaen 7 <br /> Thomas W. Peterson, P.E. <br /> TWP /crw <br />