Laserfiche WebLink
Introduction to Part 2 <br /> Part 2 consists of individual listings for the years 2000 -2006 and constitutes the Five Year <br /> Highway Improvement Plan. Year 2006 is included because some of the 2005 projects have <br /> components in 2006. You will note that in each of the years 2000 -2006, funds have been set <br /> aside for bridge maintenance, cold inplace recycling, crack filling and overlay projects. These <br /> funds essentially will be used to maintain the routes listed in Part 1 and Part 3 of this document. <br /> The projected spending for 2000 -2006 is essentially balanced but you will find that 2003 is over <br /> programmed significantly. The balance in years 1999 -2002 is achieved through issuing State <br /> Aid Bonds in the amount of 4.5 million dollars in 2001 and aggressive posture as it relates to <br /> obtaining outside funds. The issuance of these bonds allowed the construction of some major <br /> projects in 1999 and will allow additional projects to be built in 2001 if the County Board <br /> approves their sale. It will, however, result in lower amount of funds for the years 2000 -2011. <br /> Several major projects including interchange improvements, and rail grade separations are <br /> included in the last years of the Plan. Without additional outside funding, many of these projects <br /> will slide to later years of the program. <br />