Laserfiche WebLink
Anoka County Highway Department - <br /> Five Year Plan <br /> Year Engineers City <br /> Project Description Estimate Costs <br /> Number 2000 30,000 <br /> C W 0 00 -09 -00 SIGNAL PAINTING FOR 2000 0 <br /> 2000 <br /> C W 0 00 -04-00 2000 COLD INPLACR RECYCLING 130 <br /> 2000 <br /> C.W. 0 02- 030 -02 FEDERAL LED REPLACEMENTS 60,000 <br /> 02 -030 -03 FEDERAL BRIDGE GAURDRAIL AND <br /> 2000 <br /> C.W. 0 JBAR <br /> 2000 1,000,000 <br /> C.W. 0 00 -01 -00 2000 OVERLAYS <br /> 2000 105,000 <br /> C.W. 0 00 -02 -00 2000 CRACK FILLING 2000 105,000 <br /> 00 -03 -00 2000 BRIDGE MAINTENANCE <br /> C.W. 0 <br /> C.W. 0 2000 0 <br /> 00 -05 -00 2000 SIGNALS UNASSIGNED (4) 75,553 Coon <br /> Rap ids <br /> CSAH 1 02- 601 -39 CHANNELIZE AT CSAH 78, $260,000 FED 250 2000 542,317 317 <br /> 2000 - <br /> CSAH 5 02- 605 -06 INTERSECTION WITH TH 47 (96- 75 -05) g 640 Anoka <br /> 2000 120,000 <br /> CSAH 7 97 -56 -07 REVISE SIGNAL AT BOB EHLEN DR. 2 20, 895 Coon <br /> 2000 789,638 Rapids <br /> CSAH 11 02- 611 -27 SIGNAL AT XEON 317464 <br /> CSAH 12 98 -58 -153 CSAH 153 TO CSAH 23 APOLLO 3 2000 2,27,4640 <br /> 2000 <br /> CSAH 14 02- 614 -19 CSAH 9 TO TH 10 <br /> 2000 372,311 <br /> CSAH 22 02-622 -27 WEST CO LINE TO CSAH 83 22,680 Blair <br /> 2000 20,000 <br /> I NTERSECTION AT TH 47 34,56 8 0 Mn/ it <br /> CSAH 28 98 -60 -28 Coun <br /> CSAH 32 02- 632 -10 SIGNAL ATAIItPORTROAD 2000 208,00 116,965 Rams <br /> 3,020,270 103,305 Coon <br /> CSAH 78 02- 678 -11 CSAH 11 (S LEG) TO CSAH1 2.42 M FED <br /> 2000 Rap i <br /> 2000 0 <br /> CSAH 78 02- 678 -14 CSAH 1 TO 107TH AVE (02- 601 -39) 120,000 8, 640 Ano] <br /> 2000 <br /> 96 -77 -79 Signal at TH 288 <br /> C.R. 79 2000 471,669 <br /> CSAH 83 02-683 -01 CR 63 (173rd)TO CR 64 (181st) 2000 678,348 ,669 <br /> 96 -07 -84 CSAH 14 TO CEDAR STREET <br /> C.R. 84 2000 30,000 <br /> CSAH 116 99 -19 -116 COORIDOR STUDY TH 47 TO CSAH 56 <br /> CSAH 116 02- 716 -03 SIGNAL & CHANN. ® TH 65 SP 0208 -100 <br /> 2000 554,000 <br />