Laserfiche WebLink
• <br /> Sonestroo, Rosene, Anderlik and Associates, Inc. is an Affirmative Action /Equal Opportunity <br /> Bonestroo Employer and Employee Owned <br /> Principals: Otto G. Bonestroo, RE. • Marvin L. Sorvala. RE. • Glenn R. Cook, PE. • <br /> Rosene Robert G. Schunicht. PE. • Jerry A. Bourdon, RE. <br /> A nderlik & Senior Consultants: Robert W Rosene. PE. • Joseph C. Anderlik. P.E. • Richard E. Turner, PE. • <br /> Susan M. Eberlin, C.P.A. <br /> A ssociates Associate Principals: Howard A. Sanford. PE. • Keith A. Gordon. P.E. • Robert R. Piet ferle. PE • <br /> Richard W. Foster, P.E. • David O. Loskota, P.E. • Robert C. Russek. A.I A. • Mark A. Hanson, RE. • <br /> Engineers & Architects Michael T Rautmann. PE. • Ted K.Field. P.E. • Kenneth P Anderson, P.E • Mark R. Rolls, PE. • <br /> David A. Bonestroo, M.B A. • Sidney P Williamson, PE, L.S. • Agnes M. Ring. M.B.A. • Allan Rick Schmidt, RE. <br /> Offices: St. Paul, St. Cloud. Rochester and Willrfiar, MN • Milwaukee, WI <br /> Website: www.bonestroo.com <br /> June 6, 2000 JUN 7 2000 <br /> Mr. Jim March <br /> City of Centerville <br /> 1880 Main Street <br /> Centerville, MN 55038 -9794 <br /> Re: The County Bank <br /> Our File No. 616 -Gen <br /> • <br /> Dear Jim: <br /> I received a four -page preliminary plan from Shea Architects /James R. Hill for the new County Bank site at <br /> Highway 14 and 21s Avenue. The following are my comments on the Grading, Drainage and Erosion Control <br /> Plan. <br /> 1. Adjust parking lot elevations at south end to drain water across from east to west. Currently show elevation <br /> 906.5 at both gutters, which will result in ponding. <br /> 2. Need more than one (1) cubic yard of riprap at each curb opening into the pond to prevent erosion. <br /> Recommend four (4) cubic yards at each, with rock extending from curb to pond bottom. Also, install a 3' -4' <br /> long concrete flume behind the curbing, at each opening. <br /> 3. Identify the location of 21' Avenue centerline on the grading plan to see how the temporary driveway to Main <br /> Street lines up with 21 Avenue to the south. <br /> 4. What are Gerald Rehbein's plans to continue hauling black dirt off -site, since the access road will be <br /> eliminated? <br /> 5. Four inch sanitary and 6" wake, service pipes ale stubbed out to the north right -of -way line of Hwy. 14. The <br /> architect shows extending 4" sanitary and 1" water to the far northwest corner of the bank building. The <br /> restrooms and break rooms are at the southeast corner. Also, the 1" copper water line is not large enough to <br /> provide sprinkling of the building. <br /> Please forward these comments /revisions to Shea Architects & James R. Hill Engineers. Call me at 651 -604- <br /> 4868 with questions. <br /> Yours very truly, <br /> BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. <br /> 7 <br /> Thomas W. Peterson, P.E. <br /> TWP:crw <br /> 2335 West Highway 36 • St. Paul, MN 55113 • 651- 636 -4600 • Fax: 651- 636 -1311 <br />