My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-29 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2009
>
2009-12-29 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2009 3:15:43 PM
Creation date
12/23/2009 3:15:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 19, 2009 <br /> • <br /> A temate cost for Well #1: Same components as option #2 with some additional conduit work. Change <br /> the service configuration' to a single disconnect (200amp disconnect to be main disconnect for the <br /> building so the transfer switch can backup both the pump and al controls in the building). Install the <br /> transfer switch inside the building and plugs Installed outside. <br /> Not to exceed cost $6,106.00 <br /> • Alternate add to provide a Automatic transfer switch In place of manual: Add $1,100.00 <br /> Please call with questions, <br /> Thank you, <br /> Brian Kovar <br /> President <br /> • Page 2 <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.