Laserfiche WebLink
1 1 Y <br /> Pk' Area E: Circular Trail around <br /> 4: 7 4, ,x.:1 Centerville Lake <br /> c The best route for a circular trail around <br /> " Centerville Lake is on the south side of <br /> •a q <br /> ;.- ; ��' ' 1 County 14. Currently, in area E, on the south <br /> ^ ?r > �6a o 1 ' side of County 14, the property by <br /> '' 4f` 1_ '''`° Waterworks has a new house under <br /> construction and a trail could be constructed <br /> + , f ;, li t ;: as that property is developed. Other property <br /> 1( 1 ` • just south of Mound Trail on County 14 may <br /> t also be developed at some point, and when <br /> i that happens, again, a trail could be • • s t' ' l ; �' ' developed. The urgency here is to establish <br /> + 1, the specifications for the trail so that <br /> " development of the areas is done consistent <br /> with the inclusion of a trail as shown. <br /> 3 <br /> ,« Area F: Wargo Nature Center <br /> Anoka County Parks already has a plan to <br /> , construct a trail from area E to the Wargo <br /> r` ( Nature Center located at F. See Figure 3. <br /> Area G: Trail Connections <br /> Area G shows the Anoka Chain of Lakes <br /> ∎ t ti trail connecting to Lino Lakes to the west <br /> , I and eventually connecting to other trails in <br /> 3 the Metro, notably the Rice Creek Trail <br /> 4'. Y #. ' North. See Figure 4. <br /> Area H and I: Lamotte Park <br /> The largest park in Centerville is Lamotte <br /> Park located in Area H. Plans are already <br /> Figure 3. Area E, F, and G. Anoka Park Trail Plan underway to connect Lamotte Park to the <br /> Anoka County Chain of Lakes trails from H <br /> to G. To complete the Centerville Lake <br /> loop, a trail is needed from H to D. At Area I, the St Paul Water Utility has property that may come up for <br /> sale in a couple years. This area, being right across the street from Lamotte Park would make a great <br /> lakeshore park and pier, possibly jointly owned by Centerville and Lino Lakes. <br /> Area J: Centerville Trail South <br /> A current easement through Area J is perfect for a trail to be constructed as the land to the south of it is <br /> developed. Centerville will be developing a trail through area J as land is developed. This trail would <br /> provide a route to Lamotte Park and beyond in addition to providing a circular trail through central <br /> Centerville (Areas J, M, C, and H). <br /> Area K: Water Utility Easement Trail to Future Lino Lakes Recreational Park <br /> Area K has a St Paul Water Utility easement that could provide a trail between Lamotte Park and a <br /> possible future Lino Lakes Recreational area at Area L. Just north of Birch Street (between L and K), it <br /> might be possible to use currently undeveloped land, or if necessary, continue K all the way straight south <br /> 3 <br />