Laserfiche WebLink
Transitions: TrueRide Inc. Equipment Construction Specifications <br /> Transitions are framed in 6' sections with 1/4' Marine Tee treated plywood. <br /> Transitions are assembled using 2x6 CCX pressure treated lumber spaced 8" on center. <br /> 3" exterior course screws are used for assembly of structure. <br /> Transitions sheeted with two layers of 'h" CCX pressure treated plywood, fastened with 2 "coarse thread <br /> exterior screws. <br /> Liquid Nail exterior construction adhesive is applied on studs to adhere to plywood. <br /> Galvanized ''/3" carriage bolts, nuts, and washers are used to fasten units together. <br /> 30 weight tarpaper vapor barrier stapled to surface before application of Skatelite Pro. <br /> Final surface layer is /" Skatelite Pro fastened with 2 % " course thread exterior screws. 96 screws per <br /> 4'x8' sheet of Skatelite Pro. <br /> Banks: <br /> Banks are framed in 6' sections with'/" Marine Tec treated plywood. <br /> Banks are assembled using 2x6 CCX pressure treated lumber spaced 8" on center. <br /> 3" exterior course screws are used for assembly of structure. <br /> Banks are sheeted with 1/4" Marine Tec treated plywood, fastened with 2" exterior course screws. <br /> Liquid Nail exterior construction adhesive is applied on studs to adhere to plywood. <br /> W Galvanized' /" carriage bolts, nuts, and washers are used to fasten units together. <br /> 30 weight tarpaper vapor barrier stapled to surface before application of Skatelite Pro. <br /> Final surface layer is %" Skatelite Pro fastened with 2 1/2" course thread exterior screws. 96 screws per <br /> 4'x8' sheet of Skatelite Pro. <br /> Decks: <br /> Decks are framed with 2x6 CCX pressure treated lumber spaced 12" on center. <br /> i� Decks are sheeted with 3 A" Marine Tec treated plywood, fastened with 2" exterior coarse screws. <br /> [� 3" exterior course screws are used for assembly of structure. <br /> Decks are secured to structure with four 3 '/d' Galvanized lag screws with washers. <br /> I Decks supported with 4x4 pressure treated posts. Secured with 6" Galvanized 'h" carriage bolts, washers & <br /> double nuts. <br /> 30 weight tarpaper vapor barrier stapled to surface before application of Skatelite Pro. <br /> Final surface layer is' /d' Skatelite Pro fastened with 2" exterior course thread screws. <br /> Railings: <br /> Railing height 42" above deck. <br /> 6' maximum railing span per 6' of deck. <br /> Railings are framed with four 2" round galvanized pipes inserted into painted 2" cup holders and '/" plate <br /> steel. <br /> 12 3 1/2" Galvanized lag bolts with washers are used for fastening railing to 4 x 4 posts. <br /> Coping: <br /> Schedule 40, 2 '/" diameter black pipe. <br /> 2 "x 2" square tubular steel. <br /> 31/2" rectangular steel. <br /> Joints are welded and ground smooth. <br /> Fastened to ramp every 24" with #12 3 1/2" stainless steel screws. <br /> Thresholds: <br /> 3/16" Galvanized Steel thresholds from 15 "- 22" widths are used at the bottom of each ramp. <br /> Fastened to ramp every 24" with 21/2" #12 stainless steel screws. <br /> 1 <br />