Laserfiche WebLink
Forwarded to Council Members <br /> Via e-mail on 2/1/O1 at 2:46 pm. � <br /> Mr. Bruce Luikart, 7130 Peterson Trail, questioned the type of lighting in the rear of the <br /> building. Mr. Drilling stated that the lighting would be similar to the current strip ma1L <br /> Mr. Luikart questioned whether the rear, exterior of the building would be brick. Mr. <br /> Drilling concurred. <br /> Mayor Swedberg questioned Mr. Luikart as to his thoughts of the proposed strip mall. <br /> Mr. Luikart stated that he could live with the building. <br /> Mr. Jerry Engler, 7127 Shad Avenue, requested that the berm run along the north/south <br /> jog of the property. Mr. Drilling stated that he had not planned to have a berm in that <br /> location. Mr. Drilling also stated that there would be a six (6) foot fence installed on the <br /> top of the berm and trees would run north to south on the property line on the Drilling <br /> side of the fence. <br /> Mr. Peterson explained he was unable to comment on whether a berm along the <br /> north/south jog would interfere with drainage, as he did not have a map with contours. <br /> Mr. Engler asked Mr. Drilling if his trees and stakes would be replaced that were <br /> removed by construction workers when the site was cleared. Mr. Drilling agreed to <br /> restore Mr. Engler's property to its original state. <br /> Mayor Swedberg requested that Mr. Hoeft investigate whether berming the north/south <br /> jog would interfere with drainage. <br /> Mr. Engler stated he desired the berm to be moved out to the west beyond where the <br /> proposed fence is located. <br /> Council Member Broussard Vickers stated that Mr. Engler's proposal was unacceptable <br /> due to the separation of the berm and the fence. Council Member Broussard Vickers felt <br /> that this would not be attractive. <br /> Mr. March suggested waiting for Mr. Peterson's report on drainage prior to determining <br /> whether a berm in the location would work. <br /> Mr. Engler questioned the height of the trees that Mr. Drilling intended on installing. Mr. <br /> March indicated Mr. Drilling needed to submit a detailed landscaping plan, which would <br /> provide that information. Mr. Drilling indicated he would either leave the larger trees <br /> currently located on the site or use five (5) or six (6) foot landscape evergreens dependent <br /> upon County suggestion. <br /> Mr. Engler asked that construction traffic not enter the lot from Shad Avenue. <br /> Motion by Council Member Nelson, seconded bX Council Member Broussard <br /> Vickers to close the public hearing. All in favor. Motion carried unanimousl,y, <br /> Mayor Swedberg closed the public hearing at 6:50 p.m. <br /> Page 4 of 14 <br />