Laserfiche WebLink
� c. Maintenance / Storage / Chase Area: .. <br /> i. mop sink <br /> ii. on demand hot water heater � <br /> iii. water well tank <br /> iv. electrical panels / telephorie pane! � <br /> v. storage space for maintenance supplies / park informa6on literature <br /> vi. shelving <br /> vii. storage space for vending suppli�s � <br /> viii. storage space for equipment rental supplies (or in I'�feguard room) <br /> d. Vending / Concessions: <br /> i. four vending machines (soda, snacks,.candy, and ice aeam bars) <br /> ii. good orientation for visibility to beach and shelter users <br /> . iii. possibly covered or protected from elements <br /> iv. lockable at night, like garage doo� (McCarrons beach styte) <br /> e. Plaza / Information: <br /> i. orientation towards beach for relaxing; eating, view beach activities and playground <br /> ii. connect to oc relate to lifeguard room <br /> iii. vending machines nearby or incorporated � <br /> iv. 4-6 square tables (seating for 4) <br /> v. drinking fountain <br /> vi. pleasant atrnosphere to social"¢e <br /> vii. information kiosk (maps, brochures, evenf posiing, eGc.) <br /> viii. PaY Phone <br /> a. possible semi covered / veranda style � <br /> f. Beach Showers Outside: I <br /> � i: location (near building, beach, and how many) ' <br /> ii. semi private I <br /> ui. heated water <br /> iv. '� drainage <br /> Budget for Traithead / Beach Buifding: approximateiy $275,000 not induding fees I <br /> 2. Large Group Picnic Pavilion I <br /> . � <br /> Also addre"ssed in the new master plan is the Group Picnic Sheltec (see the attached section from ' <br /> the master plan). <br /> The August 11, meeting induded discussion of this faalitys needs: ,_ <br /> a: capadty -150 seated and �0 for overtlow <br /> b. patio area attached <br /> c. fire nng. like Rum River Central � <br /> d. 2 large grills <br /> e: serving counter with electricity <br /> �. � ` lighting <br /> g. water for drinking and cleaning the pavilion (underground line from swimming facitity) <br /> h. similac design and image as beach building* <br /> Budget for Large Group Favilion: approximately $120,000 not induding fees <br /> " * note the attached design of the Ysitor Center (Fgure 6.9) to be built in next phase. . Most of staff <br /> ' liked this style. This is just a concept <br />