Laserfiche WebLink
� Jun� 2, [ 999 Park anc� Recr�ation �1e�ting <br /> I <br /> Mr. l��arch �r��ntion�d th� St. Paul Water L�tili�y gav� the City p�rmission ta cross tneir <br /> easement to connect the two trails. There is a meeting scheduled on Thursday, 6/10i99 at <br /> 2:00 p.m. �tiith the St. Paul Water Utility and Anoka County. Mr. March mentioned that <br /> there were a few upset Lino Lakes residents at the last meeting. <br /> Mr. March briefly ex�l�ined tr�at a d�veloper �y the name of Rick Carlson is proposing <br /> d�v�loping 20 acres of land just sout� o� LaMott� Par�. Mr. Carlson is having a m�eting <br /> with the homeo�vners io discuss acquiring the property. This pr�perty is not scheduled <br /> � r1,� �ti ?�a „nt;l 7p01. T�1ayh� the clev€toper coutd put in a bridge when he ac�uires <br /> the pro�ert_y. Mr. March will update the Park and Recreation Committee of the status at <br /> th� next meating in July. <br /> Progress of field conciiti�n, e�ui�ment, du��outs,�avement� and ���hat's �oing on at <br /> LaMott� Park. <br /> NIr. March mentioned that some group was practicing on the ball fields at LaMott� Park. <br /> They are a?so driving on the grass. Public works is grooming the three ball fields behind <br /> the elementary school everyday. The inspector has inspected the seedin¢. The City is <br /> row just trying to keep people off of the park. � <br /> Mr. Navin mentioned he has been in contact with Dick Travis who �,�orks for Glen <br /> Rehbein. Apparently, Mr. Rehbein wants to help thc Socc�r Club and is svilling to ���� <br /> contribute their ex�ertise. <br /> Mr. Porter suggested the City talk to Joe Goetz of Goetz Landsca�ing to see if Mr. Goetz ��� <br /> has ary sug�est:ors about the grass and upkeeping of the grass at the parks. Also, sh�uld � <br /> the City post signs at the parks about driving on the grass? ' <br /> i <br /> Removal of swin� ta Ro�a� Meadows Park <br /> Mr. March €xplained that public works ;oes over to Royal Meadows Park almost daily to ! <br /> unwind the sivings. Public works hasn't had time to remove the s�i�e as of yet, but their <br /> goal is ta have it remoti�d by June l2. <br /> Mr. Natiin questione� �vhat needed to be replaced on the current sti�ing to bring it up to <br /> cocie? <br /> Ms. Lien offered all of the hardware needs to be replaced, i.e.: chains, nuts and bolts, <br /> scr€��s, ��oks for the chains, etc. Also, thc box�d in area surra�n�iing the s���ing with <br /> timbers needs to be made larger and more sand brought in. Apparently code requires that <br /> w�atever thc height of a swing is, the box�d in arca surrounding it must be twic� th� sizc. <br /> Exarnple: a 10 ft. tall swir�g need5 to !�ave an area of 2�J ft. surrounding, all sic�es. <br /> Mr. Porter felt that overall the whole park shauld be bulldozed over completely, and re- <br /> done. ivfr. March mentioned it is the one of the most heavily used parks in Centerville. <br /> 4 <br />