Laserfiche WebLink
Storm� �ater fees. The storm water fee s1r�l tlie <br /> , of the final plat. This fee is $8,983.65, based on a charge of $.01546 per square foot bf <br /> , 13-. acres o� p}atted area. <br /> , <br /> lblr.lblareh expiained th�.t �5fl°/a mu�tiplied by of <br /> $55,155.00, thus being $82,725.00. The streets and utilities will be 125°l0 ,of saine. <br /> �'h�Eoutrcii th�E>evetopErsand irrcorrjunetion <br /> with installing driveways, maintaining the building site and silt fencing. After the Counc�l <br /> �is�ZSSecrth�Hevelopers fo�l�ovving action: � <br /> Mnt' y Councilmember Travis, seconded bv Councilmember Sweeney to go with I <br /> �taffs recosnmendation an�l-chargP <br /> Motion carried unanimouslv. ' <br /> 'Fhe extra I <br /> associated with the subdivision. <br /> �'he Comzcii discussed and ofBrian-Drive-and�the <br /> north side of Eagle Trail. Mr. Lessard argued the new proposed section of sidewalk (lots , <br /> �fr; l7, � and had not�reen previously. <br /> Mr. Lessard requested the Council to waive the $5000 asphalt trail fee. The Developer � <br /> pianned pay �1200 per lot The discassed tke�future <br /> use of the commercial property which the trail is proposed to cross over. And since, no <br /> future Courrcil� ernertairted� rrot pavimgthe trail. ber <br /> agreed to waive the $SOQO trail fee. Councilmember Nelson agreed to waive the trail fee. <br /> Cotm�imember Sweeneyagreed ort�p �ecause afthe <br /> situation. Councilmember Travis concurred as long as the trail is class 5 limestone and the <br /> sidewalk is installed in lieu `o�the ��0�6: eouncirmember B voiced ctesire to <br /> keep the $5000. <br /> Motion� Cauncilmember�weeirev; seconded Coumci�member P�Felsorrto <br /> the �5000 trail escrow from the Develoners ontract with the limestone trail <br /> connectinF h .agle Trai� d�ca-c-to th� �roR� and t�include�the <br /> inc��ilation of a sidew�lk on the north side of Eag e Trail, lots 16,17, 18 & 19. <br /> N�yor VVilharber Sweettcw NElso[� Brenner Motiotrcarried <br /> Councilmember Travis suggested in future development contracts indicate all fees. <br /> , Mayor �ilharber stressed Staff�deve�opers s�vuid� Ue made aware of ai� possible cost <br /> prior to the final stages of a subdivision or development contract. <br /> j,��E UTl_T�ITY <br /> lb1r: Marck briefed the Council-�rrLa�e builc�ing and the propased <br /> agreement. Mr. March noted that he was able to get the environmental first phase $50-' <br />